Aerial view of Rush Creek Yacht Club in Heath, Texas, with marina docks, a stone breakwater, and dry boat storage on Lake Ray Hubbard beside large wooded home lots

Heath, TX

General Contractor in Heath, TX: Lake Homes and Acreage

About 50 minutes from our Plano office. Same project manager, same trades, same weekly written update you would get if we were around the corner.

Call (469) 396-4153

Heath covers a little over 12 square miles on the eastern shore of Lake Ray Hubbard, and for decades it has chosen to stay spacious. The city’s 2025 Comprehensive Plan caps density at one home per acre of developable land and says it would rather see one per three. Floodplain, lake, and right-of-way don’t count toward that acre. The result: 11,671 people by the Census Bureau’s July 2025 estimate, mostly in custom homes on big lots, with very little retail, on purpose.

So here’s the honest picture of general contracting in Heath. Most of the work is remodeling and adding on to large houses, some on septic, some with a lake out back. A smaller share is commercial finish-out in the few places the city allows it.

We’re MASACO Construction, based on Legacy Drive in Plano, about 50 minutes away by the Bush Turnpike and I-30. We haven’t built in Heath yet. Our nearest finished work is about 21 miles northwest in Allen, where Fade & Style Barber Shop went from a bare 1,500-square-foot shell to open doors in six weeks.

Fade & Style Barber Shop in Allen, a long shop floor with gold and brown barber chairs, lit mirrors on marble-look walls, and light oak plank flooring Fade & Style in Allen, the nearest MASACO project to Heath, finished from shell condition in six weeks.

One home per acre, and the houses it produced

Heath is older than it looks. The Handbook of Texas traces it to John O. Heath, who settled here in 1846, and notes the community’s 1849 post office was the first in what is now Rockwall County. The town incorporated in 1959. Then Lake Ray Hubbard filled in just west of it in 1969 and 1970, and the houses came.

The comprehensive plan’s census table shows the curve: 1,459 residents in 1980, 2,108 in 1990, 4,149 in 2000, 6,921 in 2010, and 9,769 in 2020. That math puts most of Heath’s homes after 1980, with a large share after 2000.

Zoning explains the lot sizes. The plan maps three tiers of single-family land: SFE 3.0 with a three-acre minimum, SF-43 at one acre, and SF-15 and SF-22 at about a third of an acre. It describes Heath’s housing as fully custom homes on large or medium lots. A 2014 application for Ridge Lakes, south of Rabbit Ridge Road, proposed 95 lots on 109.60 acres. The Renaissance was platted with 40-foot front setbacks.

For a remodel, that means one-off houses whose plans rarely repeat down the street, so every job starts with a tape measure.

The rulebook is moving, too. The city is rewriting its Zoning and Subdivision Ordinances, with a listening session for developers, builders, and design professionals on October 26, 2026. If an addition is on your 2027 list, we’ll check which setbacks apply the day we submit.

Remodeling custom homes on Heath’s big lots

Kitchen remodeling in a large custom house is rarely about squeezing in storage. It’s about how the kitchen meets the family room, the patio, and the view, and whether a load-bearing wall stands between them. Primary baths usually want a larger walk-in shower, a better vanity layout, and real lighting; our bathroom remodeling page covers that scope. When kitchen, baths, floors, and lighting all need work, a whole-home remodel keeps it on one permit and one schedule.

Heath’s permit list is broader than most owners expect. Building and Inspections requires a permit for interior remodels and additions, outdoor kitchens and fireplaces, cabanas, guest houses and other auxiliary buildings, retaining walls over 24 inches, window replacements, and foundation repair. Work started without one can draw a fine of up to $500.

The remodel and addition application asks you to name the electrical, plumbing, mechanical, and foundation contractors and the foundation engineer. Its approval block has six sign-off lines: building, public works, fire, city engineer, planning, and septic.

Setbacks trip up additions here. Recent variance cases show how: a Providence owner asked to let a detached garage sit 3 feet into a 15-foot side yard, and a lake lot in Heath Golf & Yacht Club, in the Kaufman County part of the city, sought 5 feet of relief from a 25-foot rear setback. Each subdivision’s planned development ordinance can add its own rules. In Heath Crossing, a 2023 zoning case took up letting Mediterranean and Spanish Revival homes use a 5/12 roof pitch without a conditional use permit. Before we design a home addition, we pull the ordinance for your subdivision.

Big houses also get rooms smaller ones skip, like a dedicated theater. That’s mostly an electrical, framing, and sound job: dedicated circuits, low-voltage runs, isolated walls, and a door that seals.

A dedicated home theater room with three tiers of charcoal leather recliners, fabric acoustic wall panels with walnut trim, a large projection screen, and a matte black ceiling Illustrative: a dedicated theater room with tiered seating, acoustic wall panels, and a dark ceiling, a frequent request in large custom homes.

Septic, sewer, and the one-acre lot

Not every Heath house is on city sewer. Heath’s subdivision rules call for a sanitary sewer connection where one is accessible, but the City Council grants variances. In April 2023 it took up a request to allow on-site septic systems on every lot of a proposed 16.453-acre addition on Smirl Drive instead of building a sewer line, force main, and lift station, per the city’s hearing notice. A 2022 case did the same for two lots in LeRuisseau.

The city permits septic systems itself. Its OSSF permit application asks for the home’s living square footage and bedroom count, the site evaluator’s and designer’s licenses, and the installer’s Heath registration number. The checklist with it wants a floor plan showing every room, closets included, with total heated and air-conditioned square footage, two soil profile holes at opposite ends of the proposed drainfield, and floodplain information. The permit to operate follows a passed inspection under the state’s TCEQ rules in 30 TAC Chapter 285.

On a septic lot, the first question about a bedroom addition isn’t framing. It’s the drainfield.

The practical version: if you’re adding a bedroom, a guest house, or a pool cabana with a bathroom, we confirm what your existing system was permitted for before we draw anything. Sometimes it’s fine. Sometimes the addition brings a system modification with it, which changes the budget and the site plan. You’ll know before you sign.

Building on the Lake Ray Hubbard shoreline

The lake isn’t Heath’s. The City of Dallas owns Lake Ray Hubbard and its take area, the strip of shore between the take line and the lake’s normal pool elevation of 435.5 feet. Under a 2004 interlocal agreement, Dallas leases that strip to Heath, and Heath subleases pieces of it to the owners whose lots back up to it.

What you can build there is set by Heath’s Lake Edge Zoning District ordinance, adopted in 2006 and revised in 2007. It’s specific:

  • Boathouses, fixed piers, dock decks, and lakeside gazebos are allowed. Boat ramps, cabanas, greenhouses, and hard surface sports courts are not, and a barbecue pit takes a conditional use permit.
  • A boathouse with its adjoining pier and dock deck can’t exceed 30 feet total width, and its roof tops out at 18 feet, or 21 with a clerestory.
  • Boathouse pilings are wrapped in masonry that matches the house, such as cut or rough limestone, brick, or river rock, starting 2 feet 8 inches above normal pool.
  • Inside the view clear zone, no new structure or planting may rise more than 6 feet above grade.

“No uses are grandfathered in the Take Area and over the Lake.”

Heath’s Lake Edge Zoning District ordinance

Dallas reviews every boat-related, dredging, and seawall proposal before approval, and dredging also needs the U.S. Army Corps of Engineers and Texas Parks and Wildlife. Heath’s lake structure checklist asks whether you hold a valid sublease and whether your contractor’s workers’ compensation, auto, and general liability certificates are attached. Sea wall repairs and replacements need a city permit as well.

Aerial view of large lakefront home lots along Heath's Lake Ray Hubbard shoreline, with wooded yards, pools, and curving streets beside open water and a passing boat Lakefront lots on Heath’s shoreline in a 2022 USDA aerial photo. The water and the strip of shore behind these yards belong to the City of Dallas.

Where Heath allows commercial space

Heath wants very little retail, and the comprehensive plan says so plainly. A typical community runs about 0.5 retail acres per 100 residents. Heath runs 0.09, a number the plan calls intentionally low, with residents shopping in Rockwall or Dallas instead.

So commercial work clusters in a few spots.

FM 740 and FM 549. The Tom Thumb center anchors this junction. When the City Council approved its zoning in October 2017, the planned development grew to just over 17.76 acres, with a 30-foot landscape buffer and at least one large canopy tree every 100 linear feet.

Laurence Drive suites. State accessibility filings show what small tenants have built along Laurence Drive: a 1,564-square-foot medical office finish-out at 511 Laurence in 2023, a 1,900-square-foot dental office at 473 Laurence in 2020, and a 1,935-square-foot sauna studio at 315 Laurence in 2024. Wellness, medical, personal service. That’s Heath’s tenant mix, and it’s the work described on our medical and wellness build-outs page.

2022 aerial view of Heath's commercial core, with the Tom Thumb center at the FM 740 and FM 549 junction, Amy Parks-Heath Elementary and Towne Center Park below it, and open pasture to the east Heath’s commercial core in 2022: the Tom Thumb center at FM 740 and FM 549, with Amy Parks-Heath Elementary and the pre-renovation Towne Center Park below it.

The Towne Center Overlay: one story, real materials

The roughly 110-acre Towne Center Overlay District sits at FM 550 and Laurence Drive, around City Hall. Its design book calls for two looks: Historic Texas, built of brick and stone, and Farmhouse Chic, with wood, stucco, and cementitious siding in white, teal, and neutrals with black metal accents.

Ordinance 220927E, adopted in September 2022, cut the height limit to one story, 18 to 25 feet tall. Two stories need a conditional use permit; three are banned. Walls must be brick, stone, wood clapboard, or board and batten, with smooth stucco on no more than 20 percent of any facade. Storefront glass must be clear, exterior security grilles are prohibited, and dumpsters go in brick or stone enclosures. We price the facade with those rules in hand, not after the Architectural Review Board weighs in.

An empty barn-style event hall with exposed timber trusses, a whitewashed wood ceiling, wide-plank white oak floors, board-and-batten walls, and tall steel-framed sliding doors open to a pasture Illustrative: a new barn-style event hall in wood, board and batten, and steel, the rural vocabulary Heath’s overlay rules favor.

The Reserve

The Heath Economic Development Corporation and Municipal Benefits Corporation own 45 acres they call The Reserve, beside 50 acres of city open space. They’re courting upscale dining and retail, a day spa or wellness center, equestrian uses, and corporate campuses, and their request for proposals closed in February 2026. In January 2025 the City Council approved a ground lease there for 1880 Kitchen, a restaurant of at least 5,500 square feet named for the year Heath was established.

Whether it’s a Laurence Drive suite or a new overlay building, our tenant improvements page explains how we scope it.

Permits, plan review, and the CO in Heath

Everything runs through 200 Laurence Drive. Building and Inspections adopted the 2021 International Code Council codes with NCTCOG and city amendments, effective October 1, 2024, along with the 2023 National Electrical Code. The commercial permit packet still lists the 2020 electrical code, so we confirm the edition with the plans examiner before drawings are final.

For anything that needs a site plan, rezoning, or plat, the city encourages a Development Review Committee pre-application meeting with Community Development, Public Works, Capital Improvement Programs, and Public Safety. The first one is free. Each one after that is $300.

The commercial packet sets the ground rules:

  • A separate permit for each tenant space or building.
  • The general contractor lists its plumbing, electrical, and mechanical contractors, and all of them must be registered with Heath before the permit issues.
  • An asbestos survey statement for any commercial remodel or demolition, an energy code analysis, and proof the plans went to the state for accessibility review.
  • A plan review goal of ten working days, starting only once the submittal is complete.

That last line is state law. TDLR requires registration and plan review when a project’s total estimated cost reaches $50,000; below that, the work still has to meet the Texas Accessibility Standards.

Food, fire, and the certificate of occupancy

Food service operations, grocery stores, day cares, and assisted living facilities need health department plan review, which the applicant submits directly to the reviewer the city names. Heath’s food service permit application lists $250 for a restaurant or club and asks about grease traps and certified food managers.

In Heath, applying for a commercial building permit is also applying for the certificate of occupancy; the packet says so in capital letters. The CO application covers a new tenant in an existing building, an expanded lease space, a new owner, or a new business name, and it routes to the building department, health, fire, and planning and zoning.

“Signing this application does not authorize occupancy of the space and/or structure.”

City of Heath CO application

Fire sign-off comes from Heath’s Department of Public Safety, where every officer is certified in law enforcement, fire protection, and emergency medical services. We know how a fire review can hold up a CO. At Fade & Style, the PVC station-wall system needed extra fire marshal test documentation first; we worked it out with the supplier and the city, and the shop still opened on its original date.

For Laurence Drive tenants, our closest match is Calibration Brain & Body in Frisco, a 4,250-square-foot wellness and media studio conversion we finished in five weeks, with a podcast studio, acoustic panels, and a custom front desk.

The lounge at Calibration Brain & Body in Frisco, with a white stone accent wall, black leather chairs on oak frames, round black fluted tables, and a blue marbled rug The lounge at Calibration Brain & Body, MASACO’s wellness conversion in Frisco.

Three Heath places locals know

The marina in the photo at the top of this page is Rush Creek Yacht Club, at 320 Rush Creek Drive. Founded on the shore of Lake Ray Hubbard in 1969, it hosted the 2024 International Sunfish Class Association World Championship and keeps wet and dry slip storage, a pool, and a dining room.

Terry Park

At 599 Terry Lane, Terry Park is the city’s lakeside park, with a two-lane boat ramp and two courtesy docks, a covered pavilion, and a playground. The city’s parks page calls it one of Heath’s best spots for boating, picnics, and sunsets, and keeping it open for residents’ use of the lake is a written objective in the comprehensive plan.

2022 aerial view of Terry Park in Heath, Texas, a grassy point on Lake Ray Hubbard with a parking lot, a looping walking path, and a boat ramp at the end of Terry Lane Terry Park on its point at the end of Terry Lane, in a 2022 USDA aerial photo.

Towne Center Park

The city’s signature park, at 1000 Festival Street, sits beside City Hall and Amy Parks-Heath Elementary. Its renovation and addition was registered with the state at an estimated $12.5 million. The city now lists an event lawn and pavilion sized for up to 2,000 people, eight pickleball courts, a splash fountain, and a pond meant to be refilled from the city’s Water Well #1.

How a Heath project runs with MASACO

Our process has six steps everywhere, and Heath shapes most of them.

  1. Understand. We walk the house or suite and pull your subdivision’s ordinance, septic permit, and any take area sublease.
  2. Visualize. You see 3D renderings before any price.
  3. Plan. A fixed-scope proposal organized by trade, with allowances spelled out.
  4. Execute. One project manager, a written photo update every week, and every Heath permit and Dallas lake review handled by us.
  5. Deliver. As-builts, permits, inspection records, the CO when there is one, and warranties, in one close-out package.
  6. Support. We stay reachable after handover.

Heath is about 50 minutes from our Plano office. Opening a lake house kitchen to the view, adding a guest house on a septic lot, or fitting out a wellness suite on Laurence Drive? Schedule a consultation, and we’ll bring Heath’s own checklists to the first meeting.

Building in Heath: what to know.

Heath grew from 1,459 residents in 1980 to 9,769 in 2020 under a plan that allows no more than one home per acre of developable land, so the city is mostly custom homes on large lots, some on septic systems, with lake homes backing up to a Lake Ray Hubbard shoreline the City of Dallas owns. Commercial space is kept deliberately scarce, mostly around the Tom Thumb center at FM 740 and FM 549 and the Towne Center Overlay District near City Hall, where new buildings are held to one story. Building and Inspections at 200 Laurence Drive handles building permits, septic permits, and certificates of occupancy under the 2021 international codes and the 2023 National Electrical Code.

Heath neighborhoods and districts.

  • Heath Golf & Yacht Club
  • Buffalo Creek
  • Antigua Bay
  • Stoneleigh
  • Heath Crossing
  • Providence
  • McCrummen Estates
  • The Renaissance
  • Ridge Lakes
  • Shepherds Glen
  • Cove Ridge
  • LeRuisseau
  • Towne Center Overlay District
  • The Reserve

Heath on the map.

Open Heath, TX in Google Maps

Photo credits

  • M 3209613 nw 14 060 20220704.tif (cropped) by NOAA Office for Coastal Management / USDA-FSA Aerial Photography Field Office (NAIP 2022), Public domain, via Wikimedia Commons.
  • M 3209613 nw 14 060 20220704.tif (cropped) by NOAA Office for Coastal Management / USDA-FSA Aerial Photography Field Office (NAIP 2022), Public domain, via Wikimedia Commons.
  • M 3209613 nw 14 060 20220704.tif (cropped) by NOAA Office for Coastal Management / USDA-FSA Aerial Photography Field Office (NAIP 2022), Public domain, via Wikimedia Commons.
  • M 3209612 ne 14 060 20220704.tif (cropped) by NOAA Office for Coastal Management / USDA-FSA Aerial Photography Field Office (NAIP 2022), Public domain, via Wikimedia Commons.

What we build in Heath

Every service, one accountable contractor.

All services
Order counter at Pizza Twist in Irving, a franchise restaurant built by MASACO as general contractor 01

General Contracting

One accountable general contractor for Dallas remodels, additions, and build-outs: design, permits, licensed trades, and a single project manager.

Timelines follow scope: single-room projects often run a few weeks on site, while additions and whole-home work typically run several months.

Explore
Open-plan living and dining room after a whole-home remodel of a 1960s Dallas ranch house: removed walls, vaulted ceiling with beams, white 02

Whole-Home Remodeling

Whole-home remodels for Dallas houses built from the 1920s to the 1990s: opened floor plans, structural work, new systems, and one project manager start to finish.

Whole-home remodels commonly run 4 to 9 months on site depending on structural scope; design, engineering, and permitting add time before demolition.

Explore
Finished modern kitchen remodel in a Dallas home: large island with quartz countertop, flat-panel walnut and painted cabinetry, pendant ligh 03

Kitchen Remodeling

Design-build kitchen remodels across Dallas: new layouts, cabinetry, countertops, lighting plans, and relocated plumbing and electrical, permitted and inspected.

Full kitchen remodels typically run 6 to 10 weeks on site once cabinets and countertops are ordered; design and ordering add several weeks up front.

Explore
Finished primary bathroom remodel: large-format porcelain tile, curbless shower with frameless glass, floating walnut double vanity, warm sc 04

Bathroom Remodeling

Primary and hall bathroom remodels across Dallas: tub-to-shower conversions, wet rooms, proper waterproofing, relocated plumbing on slab, permitted and inspected.

Primary bathroom remodels typically run 4 to 8 weeks on site once tile, glass, and fixtures are in hand; hall baths often run shorter.

Explore
Newly built sunlit family room addition on a North Texas home, seen from the original house through a wide cased opening, matching trim, tal 05

Home & Room Additions

Ground-floor and second-story additions for Dallas homes, designed in 3D, engineered for your slab, and built to match the original brick.

Additions commonly run several months from design approval to move-in, depending on size, engineering, and permit review.

Explore
Exterior of a newly built contemporary custom home in a North Texas suburb at golden hour: limestone and dark standing-seam roof, large glaz 06

Custom Home Building

Design-build custom homes and teardown rebuilds on Dallas infill lots, visualized in 3D and priced by phase before you commit.

Custom homes commonly take a year or more from design through move-in, and teardown lots add demolition and utility work up front.

Explore
Client lounge at Calibration Brain & Body in Frisco, a 4,250 SF commercial build-out by MASACO 07

Commercial Construction & Build-Outs

Interior build-outs and light commercial construction for offices, retail, and medical spaces across Dallas, scheduled around your business hours.

Interior build-outs commonly run a few months from permit to certificate of occupancy, and ground-up light commercial takes considerably longer.

Explore
Fade & Style Barber Shop shop floor in Allen, a shell-to-open tenant improvement by MASACO 08

Tenant Improvements & Interiors

Tenant improvement build-outs for restaurants, franchises, salons, and retail across Dallas-Fort Worth, from shell space to certificate of occupancy.

Most single-tenant build-outs run 5 to 8 weeks on site once permits are in hand

Explore

FAQ

Questions from Heath owners.

Let's build what's next

Planning a project in Heath?

Call Now