Brick storefronts on Ballard Avenue in historic downtown Wylie, Texas, led by a two-story tan brick building with a blue awning on the corner

Wylie, TX

General Contractor in Wylie, TX: Suites, Storefronts, Homes

About 40 minutes from our Plano office. Same project manager, same trades, same weekly written update you would get if we were around the corner.

Call (469) 396-4153

Wylie calls itself the city between the lakes, and the map agrees: Lavon Lake on one side, Lake Ray Hubbard on the other. In 2000 it had 15,132 residents. The Census Bureau’s Vintage 2025 estimate puts it at 63,842, spread across parts of Collin, Rockwall, and Dallas counties. Most of that growth landed in a single decade, and you can see it in nearly every building here.

Our office on Legacy Drive in Plano is about 40 minutes away. We haven’t finished a project inside Wylie’s city limits yet, and we won’t dress that up. Our closest work is in Allen, roughly ten miles northwest. There we took Fade & Style Barber Shop from an empty 1,500-square-foot shell to opening day in six weeks. Suites that size show up on Wylie’s own leasing flyers today.

Barber stations at Fade & Style in Allen with marble-look station walls, dark wood slat columns, lit mirrors, and leather barber chairs Nearby in Allen: Fade & Style Barber Shop, a MASACO build-out that went from bare shell to grand opening in six weeks.

Highway 78, FM 544, and Ballard Avenue

Two roads carry most of Wylie’s commerce. State Highway 78 cuts through town on a diagonal, and FM 544 runs into it. The Wylie Economic Development Corporation says TxDOT has widened both into six-lane arterials, with the President George Bush Turnpike 4.5 miles away and downtown Dallas 24 miles to the southwest.

FM 544 is where people shop. Woodbridge Crossing, at 3440 FM 544, is a Target center whose neighbors include H-E-B, CVS, Floor & Decor, Kohl’s, and HomeGoods. The EDC’s 2026 flyer for the center counts 56,296 cars a day on FM 544 out front. Its list of open suites reads like a menu of small-business build-outs: a 1,350-square-foot endcap with a patio, a 5,760-square-foot space that can be split, and two 2,000-square-foot second-generation restaurants. Shadow Creek Village, at 2722 East FM 544, sits next to a Kroger Marketplace.

The stone Welcome to Wylie monument on FM 544 in Wylie, Texas, with a brick retail strip and traffic across the road behind it The stone welcome monument on FM 544, with one of the corridor’s brick retail strips across the road.

A second-generation restaurant suite saves money only when the old kitchen layout fits your menu. Walk it with your contractor before you sign.

Highway 78 is the working road. The EDC keeps its own office at 250 South Highway 78 and is marketing an 8.32-acre redevelopment site it owns at Highway 78 and Brown Street, where its traffic counts show 46,111 cars a day. Behind the storefronts, Wylie makes things. The EDC’s employer list tops out with Wylie ISD at 3,200 employees and the North Texas Municipal Water District at 1,002, and it marks Sanden International and Carlisle Coatings & Weatherproofing as headquartered here.

Rail is the other draw. The Wylie Intermodal Terminal, a $64 million Canadian Pacific Kansas City hub that opened July 9, 2015, comes with a 362-acre greenfield site sized for about 2 million square feet of light industrial and distribution space.

Downtown is the third district: small, old, brick, and governed by its own zoning rules.

Childcare suites, cafes, and the rest of the tenant mix

Wylie’s centers lease to the tenants we build for: barbers and salons, cafes, quick-service food, wellness suites, small offices. See tenant improvements for scope.

One use needs its own paragraph in a city whose biggest employer is the school district: childcare. Childcare is among the most regulated uses a strip-center suite can take, and Texas sets the floor area itself. The state’s minimum standards call for at least 30 square feet of indoor activity space for each child a center is licensed to serve, and a companion rule asks for 80 square feet of outdoor play space for each child using the yard at one time. Run those two numbers before anyone draws a cubby. A suite that looks generous on a flyer can license fewer children than you’d guess, and the yard is often the limit.

Then come the classroom details: hand sinks at child height, a floor that cleans easily and forgives a fall, windows that look onto the yard. Wylie’s daycares also sit on Collin County’s food inspection list, covered below.

A finished toddler classroom in a newer single-story childcare center with low birch cubbies, child-height sinks, a soft rubber floor, and large windows facing a fenced play yard Illustrative: a finished classroom in a newer single-story childcare center, with low cubbies, child-height sinks, and a soft rubber floor.

A railroad downtown and a housing boom from the 2000s

Wylie’s buildings come in two big layers, with surprisingly little between them.

The first is the railroad town. The city’s own history starts with a settlement called Nickelville and a Santa Fe right-of-way agent, Col. W.D. Wylie, who wanted a town named after him. The post office application was received June 10, 1886, and the first Gulf, Colorado and Santa Fe train rolled in that October 13. The Cotton Belt line arrived from Greenville the next year. Until the early 1960s, Wylie called itself the “Onion Capital of the World,” washing onions in big tanks downtown before shipping them out.

That town survives on Ballard Avenue. The 1934 Sanborn fire insurance map below shows storefronts lining both sides of Ballard between Marble and Oak streets: a post office, drugstores, a movie house, a bank. Whatever still stands from that map is a century old or close to it. Renovating one means old masonry, and in Wylie it also means paperwork: the city’s commercial plan review packet requires an asbestos survey for any remodel, renovation, or finish-out permit.

A 1934 Sanborn fire insurance map of downtown Wylie, Texas, showing storefront blocks shaded pink along both sides of Ballard Avenue between Marble and Oak streets Ballard Avenue on the 1934 edition of the Sanborn fire insurance map, with its storefront blocks shaded pink between Marble and Oak streets.

The second layer is the boom. The city’s facts page shows 3,152 residents in 1980 and 8,716 in 1990. Then the permits took off: 749 single-family permits in 2001, a peak of 1,415 in 2003, and at least 1,000 every year from 2002 through 2006. The comprehensive plan, Envision Wylie, says roughly 50 percent of all housing in the city was built from 2000 to 2009.

That’s the headline for a homeowner. A house finished in 2004 is 22 years old now. Unless someone has already redone them, its baths and kitchen are original. The same plan flags the older neighborhoods in and around downtown and South Ballard Avenue, plus the area around Kirby and Ballard, for potential minor repair. Those homes predate the subdivisions, and they’re often where a whole-house update makes the most sense.

Wylie permits, plan review, and the CO

Wylie’s Building Inspection Department works out of the Municipal Complex at 300 Country Club Road, Building 100, with registration and permitting on the first floor and inspectors on the second. The city’s list of projects requiring permits is broad. Commercial new buildings, finish-outs, remodels, and additions are on it, and so are residential remodels, water heater replacements, and window replacements. The codes page lists the 2021 international codes with the North Central Texas Council of Governments regional amendments, plus the 2020 National Electrical Code.

Contractors register before they pull anything. Wylie’s fee schedule charges general contractors $100 a year, with registration valid January 1 through December 31. On a tenant finish-out, the general contractor’s permit is $0.30 per square foot under roof with a $100 minimum, and each trade contractor pulls a separate $100 permit.

What the commercial packet asks for

The packet says commercial plan review “can take up to 45 days,” and incomplete submittals aren’t received at all. Each drawing goes up as its own PDF from an online contractor account. These items catch first-timers:

  • A code review sheet with construction type, occupancy classification, occupant load, exit widths, and parking counts
  • Fire walls marked with the testing lab’s design number (UL, USG, and so on)
  • Smoke detectors shown on any mechanical unit over 2,000 CFM, so it shuts down on smoke
  • An asbestos survey certification for any remodel, renovation, or finish-out
  • A food establishment smoking ordinance compliance form
  • Proof of TDLR accessibility registration on projects valued over $50,000

The city’s development review guide adds that building plan review runs in rounds of about 10 days each, and that the certificate of occupancy needs sign-off from Building, Planning, Fire, and Engineering. Four departments, one piece of paper. A commercial CO is $75 on the fee schedule.

Wylie Fire Rescue’s side of the job

Fire review runs through Wylie Fire Rescue’s Community Risk Reduction Division at 2000 North State Highway 78. Its permits page posts an approved list of three third-party plan reviewers. The division’s common commercial violations list is worth reading before any final: an address in letters at least 4 inches tall, a 2A:10BC extinguisher mounted 3 to 5 feet off the floor with a current service tag, a key box with the master key, and the CO posted. Wylie wants that key box 6 feet off the ground, on the same wall as the front door.

We’ve cleared this kind of finish review nearby. At Fade & Style, the PVC station walls needed extra fire marshal test documentation before the CO. We got the data from the supplier, and the shop still opened on its original date. In Wylie, we collect test reports for unusual wall and ceiling finishes before they’re ordered.

Long shop floor at Fade & Style in Allen with two rows of barber stations, marble-look wall panels, dark wood slat columns, lit mirrors, and gold barber chairs Nearby in Allen: the Fade & Style shop floor, where the station wall panels needed extra fire test documentation before the CO.

Food and daycare inspections run through Collin County

Wylie contracts this part out. The city’s food scores page says the Collin County Health Department handles routine inspections of food facilities, including restaurants, daycare centers, schools, and grocers, scoring them on a 100-point scale under the Texas food establishment rules. The city adds a $50 annual food service establishment permit. See restaurant construction for how we handle food-service builds.

Pizza Twist in Irving with a light wood order counter, digital menu boards, string lights across a dark ceiling, a pizza mural, and red and gray dining chairs Food-service work by MASACO: Pizza Twist in Irving, a 2,000-square-foot franchise restaurant built out while it stayed open.

Downtown’s Historic Review Commission

Downtown Wylie is a zoning district, not just a nickname. The city’s zoning ordinance sets up a Downtown Historic District bounded generally by State Highway 78 on the south and Cottonbelt Avenue on the west, taking in lots along Ballard Avenue north of Brown Street. New construction and substantial renovation need site plan and design review, and the seven-member Historic Review Commission recommends action to the Planning and Zoning Commission or City Council.

What counts as substantial surprises people. Moving or redesigning windows and doors does. So does adding more than 10 percent floor area, or exterior materials that don’t match. So does interior work that changes how the building looks from the street; the ordinance’s own example is a drop ceiling that covers part of an existing window. Interior renovation that leaves the exterior alone, like-for-like repairs, and matching paint can be handled at staff level.

The ordinance also discourages painting brick that has never been painted, replacing original windows and doors, and vinyl windows. The commission meets on the fourth Thursday of the month as needed, and applications are due 10 days ahead.

Remodeling Wylie’s 2000s two-story homes

When half a city’s houses come from one decade, the remodels rhyme. In a two-story house from the early 2000s, the hardest-working room is often the shared bath upstairs, the Jack-and-Jill between two kids’ bedrooms. Twenty years of bath time wears out the original vanity, the grout, and the shower curtain rod. Our bathroom remodeling work there usually means a double vanity in a finish that shrugs off toothpaste, a patterned porcelain floor that hides scuffs, and glass on the tub-shower instead of a curtain.

A remodeled kids' Jack-and-Jill bathroom in a 2000s two-story home with a deep teal double vanity, navy and white patterned floor tile, and a tub-shower with a glass panel Illustrative: a shared kids’ bath upstairs in a 2000s two-story house, rebuilt around a double vanity, patterned tile, and a glass tub-shower panel.

Kitchens from those years tell a similar story: builder cabinets, tired counters, and lighting nobody chose. Kitchen remodeling there is mostly about layout and storage. In the older houses near downtown that the city’s plan flags for repair, a whole-home remodel under one permit and one schedule is usually the cleaner path.

The city’s rules for a house are simple to state. Residential remodels and room additions need a permit, and the Building Inspection Department quotes 5 to 10 business days for residential plan review. The fee schedule sets the general contractor’s remodel permit at $0.30 per square foot with a $50 minimum, plus $50 for each trade contractor. Wylie’s construction hours are 7 a.m. to 9 p.m., Monday through Saturday, with no Sunday work and no deliveries outside those hours. Inspectors issue stop work orders on the spot for violations.

Wylie’s permit forms make the applicant certify they’ve reviewed the covenants and deed restrictions on the property, and they state that a permit is no ruling on them. Neighborhoods like Woodbridge, Birmingham Farms, and Sage Creek all appear in the city’s HOA directory, so we put the association’s review on the schedule before demolition.

Two Wylie places every local knows

Ballard Avenue and the Brown House

The storefronts at the top of this page are on Ballard Avenue, which the city’s downtown page calls Wylie’s main street. The nickname “Wide Awake Wylie” comes from here, from shop owners staying open late for crowds the railroad brought in. Bluegrass on Ballard fills the street in July, and Boo on Ballard brings trick-or-treaters at Halloween.

On the same street, at 301 North Ballard, stands the Thomas and Mattie Brown House. The Texas Historical Commission’s marker says the Browns built this ornate Queen Anne house in 1905, with a wraparound porch on slender paired Doric columns and original fishscale shingles on its four dormer gables. It became a Recorded Texas Historic Landmark in 1992.

The same year, the state recognized Stonehaven, the 1912 house William E. Stone designed after studying Frank Lloyd Wright. When Alanis Drive had to be widened, the house was moved in December 2015 and now stands at 1450 South Ballard. Movers lifted it 18 to 20 inches on hydraulic jacks and pulled it about 400 feet north by truck, inches at a time, over most of two days.

Lavon Lake and East Fork Park

The U.S. Army Corps of Engineers runs Lavon Lake from an office on Skyview Drive in Wylie. The lake supplies water to the member cities of the North Texas Municipal Water District and provides flood control for the Collin, Dallas, and Rockwall County areas. The city’s Lake Lavon page puts it at about 21,400 acres and roughly 1.6 million visits a year. The photo below is from East Fork Park, whose gatehouse sits at 1901 Skyview Drive.

Calm blue water of Lavon Lake stretching to a low tree line under scattered clouds, seen from the sandy shore at East Fork Park in Wylie, Texas Lavon Lake from the shore at East Fork Park in Wylie, July 2012.

How a Wylie project runs with MASACO

Our six steps are the same everywhere, and the process page explains each one. Here’s how they land in Wylie.

  1. Understand. We walk the FM 544 suite, the Ballard Avenue storefront, or the house, and read the lease or HOA rules with you.
  2. Visualize. 3D renderings come before any price.
  3. Plan. A fixed-scope proposal organized by trade, with every allowance written out.
  4. Execute. One project manager and a written photo update every week. We file with Building Inspection and line up fire, county health, and historic review where they apply.
  5. Deliver. As-builts, permits, inspection records, the CO, and warranties in one close-out package.
  6. Support. We answer the phone after the job closes.

Leasing a second-generation suite at Woodbridge Crossing, fitting out a childcare center, restoring a Ballard Avenue storefront, or finally fixing the kids’ bath in a 2004 two-story? Book a consultation. We’ll make the 40-minute drive, walk it with you, and come back with a plan and a schedule you can hold us to.

Building in Wylie: what to know.

Wylie grew from 15,132 residents in 2000 to an estimated 63,842 in 2025, and its own comprehensive plan says roughly half the city's housing was built from 2000 to 2009. Commercial space follows two six-lane roads, State Highway 78 and FM 544, plus the brick storefronts of the historic downtown on Ballard Avenue. The City of Wylie Building Inspection Department at 300 Country Club Road issues permits and certificates of occupancy under the 2021 international codes with North Central Texas regional amendments.

Wylie neighborhoods and districts.

  • Historic Downtown Wylie
  • Woodbridge
  • Birmingham Farms
  • Bozman Farm Estates
  • Dominion of Pleasant Valley
  • Creekside Estates
  • Kreymer Estates
  • Sage Creek
  • Stone Ranch
  • Riverchase
  • Wylie Lakes
  • Lewis Ranch
  • Woodbridge Crossing
  • State Highway 78 corridor

Wylie on the map.

Open Wylie, TX in Google Maps

Photo credits

  • Downtown Wylie Texas Wiki (1 of 1).jpg by Renelibrary, CC BY-SA 4.0, via Wikimedia Commons.
  • Wylie.png by Slickmash, CC BY-SA 4.0, via Wikimedia Commons.
  • Sanborn Fire Insurance Map from Wylie, Collin County, Texas, 1934, Plate 0002.jpg (cropped) by Sanborn Map Company, via the Library of Congress, Public domain, via Wikimedia Commons.
  • Lake Lavon Vista.jpg by Robert Nunnally, CC BY 2.0, via Wikimedia Commons.

What we build in Wylie

Every service, one accountable contractor.

All services
Order counter at Pizza Twist in Irving, a franchise restaurant built by MASACO as general contractor 01

General Contracting

One accountable general contractor for Dallas remodels, additions, and build-outs: design, permits, licensed trades, and a single project manager.

Timelines follow scope: single-room projects often run a few weeks on site, while additions and whole-home work typically run several months.

Explore
Open-plan living and dining room after a whole-home remodel of a 1960s Dallas ranch house: removed walls, vaulted ceiling with beams, white 02

Whole-Home Remodeling

Whole-home remodels for Dallas houses built from the 1920s to the 1990s: opened floor plans, structural work, new systems, and one project manager start to finish.

Whole-home remodels commonly run 4 to 9 months on site depending on structural scope; design, engineering, and permitting add time before demolition.

Explore
Finished modern kitchen remodel in a Dallas home: large island with quartz countertop, flat-panel walnut and painted cabinetry, pendant ligh 03

Kitchen Remodeling

Design-build kitchen remodels across Dallas: new layouts, cabinetry, countertops, lighting plans, and relocated plumbing and electrical, permitted and inspected.

Full kitchen remodels typically run 6 to 10 weeks on site once cabinets and countertops are ordered; design and ordering add several weeks up front.

Explore
Finished primary bathroom remodel: large-format porcelain tile, curbless shower with frameless glass, floating walnut double vanity, warm sc 04

Bathroom Remodeling

Primary and hall bathroom remodels across Dallas: tub-to-shower conversions, wet rooms, proper waterproofing, relocated plumbing on slab, permitted and inspected.

Primary bathroom remodels typically run 4 to 8 weeks on site once tile, glass, and fixtures are in hand; hall baths often run shorter.

Explore
Newly built sunlit family room addition on a North Texas home, seen from the original house through a wide cased opening, matching trim, tal 05

Home & Room Additions

Ground-floor and second-story additions for Dallas homes, designed in 3D, engineered for your slab, and built to match the original brick.

Additions commonly run several months from design approval to move-in, depending on size, engineering, and permit review.

Explore
Exterior of a newly built contemporary custom home in a North Texas suburb at golden hour: limestone and dark standing-seam roof, large glaz 06

Custom Home Building

Design-build custom homes and teardown rebuilds on Dallas infill lots, visualized in 3D and priced by phase before you commit.

Custom homes commonly take a year or more from design through move-in, and teardown lots add demolition and utility work up front.

Explore
Client lounge at Calibration Brain & Body in Frisco, a 4,250 SF commercial build-out by MASACO 07

Commercial Construction & Build-Outs

Interior build-outs and light commercial construction for offices, retail, and medical spaces across Dallas, scheduled around your business hours.

Interior build-outs commonly run a few months from permit to certificate of occupancy, and ground-up light commercial takes considerably longer.

Explore
Fade & Style Barber Shop shop floor in Allen, a shell-to-open tenant improvement by MASACO 08

Tenant Improvements & Interiors

Tenant improvement build-outs for restaurants, franchises, salons, and retail across Dallas-Fort Worth, from shell space to certificate of occupancy.

Most single-tenant build-outs run 5 to 8 weeks on site once permits are in hand

Explore

FAQ

Questions from Wylie owners.

Let's build what's next

Planning a project in Wylie?

Call Now