One-story brick storefronts on Main Street in downtown Mesquite, Texas, including the Carroll Place building with its painted sign

Mesquite, TX

General Contractor in Mesquite, TX, Town East to I-20

About 35 minutes from our Plano office. Same project manager, same trades, same weekly written update you would get if we were around the corner.

Call (469) 396-4153

Mesquite did most of its growing in one burst. The Handbook of Texas records 1,696 residents in 1950 and 55,131 by 1970, and Town East Mall opened in 1971 as the largest mall in the Dallas-Fort Worth area. So most buildings you’d lease or remodel here were built for an earlier generation of shoppers and homeowners. The exception is the south end, where farmland along I-20 is turning into subdivisions and new retail pads.

Mesquite had 150,693 residents as of July 2025, by Census Bureau estimate. Nearly all live in Dallas County; only about 210 live in the city’s small slice of Kaufman County.

MASACO Construction builds commercial interiors first and remodels homes too. From our Plano office, downtown Mesquite is roughly a 35-minute drive, most of it on I-635. No MASACO project stands in Mesquite yet, and this page won’t suggest one does. The closest work we can show you is Pizza Twist in Irving, roughly 2,000 square feet of franchise restaurant with a full kitchen and new utility connections, delivered in a 6 to 8 week window without the owners ever closing their doors. Up in Allen, Fade & Style Barber Shop went from an empty 1,500 square foot suite to its grand opening in six weeks.

Pizza Twist dining room in Irving with a green living wall, a yellow neon script sign, a tufted leather sofa, and string lights over the booths Nearby in Irving: Pizza Twist, MASACO’s closest finished project to Mesquite.

Mesquite’s commercial space, corridor by corridor

Four highways run through Mesquite: I-635, I-30, I-20, and US 80. Each carries a different kind of building, and the building type drives most of your cost and schedule.

Town East Mall and the TERRA district

Start with Town East. The Mesquite EDC’s shopping and entertainment page puts the mall at more than 1.2 million square feet, with three department stores, 170 specialty shops, parking for 7,000 cars, and 2,250 jobs, and calls it the area’s second-largest employer. The mall’s own website advertises space for lease. In a mall open since 1971, inline suites change hands, and every new tenant means a build-out.

The city drew a zoning line around this district in 1996. The Town East Retail and Restaurant overlay, known as TERRA, opens with a sentence that still holds:

“The Town East area has emerged as the major business center for eastern Dallas County.”

From Mesquite’s TERRA overlay regulations.

TERRA keeps each parcel’s base zoning but adds a list of restricted uses that need a conditional use permit. Three of them catch tenants off guard: body art studios, used merchandise and resale stores, and laundries bigger than 3,500 square feet. If your concept is on the list, that approval comes before your build-out schedule, not alongside it. Check the use before you sign.

An inline storefront in an enclosed 1970s mall being re-tenanted behind a gray construction barricade, with new bronze-framed glass panels going in above it Illustrative: an inline mall suite being re-tenanted behind a barricade while the new storefront glazing goes in.

Inline mall work runs on the landlord’s rules. Barricades, delivery windows, storefront standards, and ties into the mall’s life safety systems usually sit in the work letter and construction rules, and we read both before pricing anything. Our retail and salon build-outs page covers storefront and finish scope.

The Gus Thomasson Corridor

Gus Thomasson Road enters Mesquite in the northwest, near La Prada Event Center and Country Club Estates, then runs southeast, parallel to I-635 and North Galloway Avenue, across I-30. The EDC’s corridor page says the northern stretch sits inside a tax increment reinvestment zone and points to Thomasson Square, a mixed-use redevelopment with an estimated $558 million economic impact.

Along Gus Thomasson, expect second generation space: a previous tenant’s ceiling grid, restrooms, and electrical service. Some of it is worth keeping. Some costs more to work around than to clear. We walk the suite before you sign and tell you which kind it is, and our tenant improvements page explains how that scope gets priced.

A long, narrow barber shop at Fade & Style in Allen with rows of gold barber chairs, lit mirrors, marble-look walls, and light wood plank flooring Nearby in Allen: Fade & Style, a deep inline suite MASACO finished out in six weeks.

I-20, Trinity Pointe, and first generation space

South of I-20, Mesquite is still filling in. The EDC’s Trinity Pointe page lists about 4,500 planned homes across Talia, Polo Ridge, Trinity Pointe Village, and Trailwind, and reports that commercial development has begun at Heartland Town Center, with 25 acres of I-20 frontage available.

New retail there will be first generation: a slab, demising walls, a few utility stubs, and nothing else. That’s a clean start. It also ties your opening date to the landlord, because the city’s certificate of occupancy requirements say a shell certificate of occupancy must be completed and on file before anyone occupies an interior lease space.

Skyline, the rail yard, and the airport

Mesquite’s industrial core is the Skyline Logistics Hub, the manufacturing and distribution district around Big Town and Town East Boulevards that runs from I-30 to Skyline Boulevard. The city gave it an overlay district in 2015. The EDC’s infrastructure page calls the Union Pacific facility here the fourth-largest UP intermodal in the country and notes the 6,000-foot runway at Mesquite Metro Airport, which the city bought in 1983.

Inside those buildings, the work that fits us is the occupied part: front offices, break rooms, and restrooms. One local rule matters if you’re leasing a big empty box. Mesquite’s 2024 building code amendments treat any storage occupancy or speculative building over 6,000 square feet with more than 14 feet of clear height as high-piled storage, and a spec warehouse with no identified product gets fire protection designed for Class IV commodities.

Downtown and the brick that built Mesquite

Downtown is where Mesquite began, as a Texas and Pacific Railway depot town in May 1873. The town square came in 1901. The first factory near town, in 1904, was the Dallas Pressed Brick Company, and brick still shows up on a lot of Mesquite jobs.

The EDC’s downtown page counts more than 75 businesses, notes downtown’s Texas and National Main Street designations, and describes a multi-phase, $14.1 million city infrastructure project to set up new restaurants, shops, and entertainment. Along Main and Broad Streets you’ll find low brick storefronts, a few still wearing old painted signs.

Heritage Plaza and the McWhorter Greenhaw building on Broad Street in downtown Mesquite, one-story brick and painted storefronts facing a parking lot Heritage Plaza and its neighbors on Broad Street, downtown Mesquite.

If a property is a designated Mesquite Landmark or sits in a Historic Preservation Overlay District, section 4-400 of the zoning ordinance applies and the Mesquite Landmark Commission has a say. Call the city’s preservation office before the drawings get far.

Commercial renovations also carry a state asbestos rule. Mesquite wants evidence that a survey covered the parts of a commercial building you’re renovating, and the city’s asbestos FAQ says surveys apply regardless of the year a building went up, with an alternative for newer ones.

The houses: two in three built from 1950 to 1989

The Census Bureau’s 2020 to 2024 American Community Survey counts 53,953 housing units in Mesquite. About 28 percent went up in the 1960s and 1970s, another 28.5 percent in the 1980s, and about 10 percent in the 1950s. Only about 6 percent were built in 2010 or later. And by the same survey, 38,140 of those units are detached single-family houses.

Do the math: two of every three Mesquite homes date from 1950 to 1989. Plan on wiring that may be sized for 1965 appliances rather than an induction range and an EV charger, original drain lines worth a camera inspection, and kitchen walls that may carry the roof.

Home remodeling in Mesquite, TX: the brick ranch years

Kitchens first. In a 1960s or 1970s Mesquite ranch, the kitchen is often a closed room, sometimes still with its original cabinets and a soffit above them. The usual question is whether it can open to the den, and the answer depends on the wall. A city handout on permitting unpermitted work calls for engineer-stamped plans on load-bearing walls, and we hold any wall we move to that standard. More in kitchen remodeling.

Baths come next. Hall baths from these decades are small, and the primary bath is often barely bigger. On a slab, every relocated drain is a trench through concrete, so we fix fixture locations before demolition. Details are on our bathroom remodeling page.

The same city handout carries a warning for buyers of older houses. Remodels, garage conversions, and room additions done without permits must go back through permitting, with before-and-after floor plans and proof of electrical, plumbing, and energy code compliance. Bought a house with an old garage conversion? Find out whether it was permitted before you build on it.

Rentals add two rules. Rental owners don’t qualify as homeowner contractors, so a licensed contractor pulls the permits. And every rental needs a Single-Family Rental Property License: $150 covers the application and two inspections, a $500 pre-occupancy fee applies if a tenant moves in before the house passes, and since February 1, 2026 a passing green tag is good for 90 days. Time the last coat of paint to the move-in date.

A 1970s single-story brick ranch house after a curb-appeal update with white painted brick, black-framed windows, a natural oak front door, a cedar porch cover, and new planting beds Illustrative: a 1970s brick ranch after a curb-appeal update, with painted brick, new windows and door, a porch cover, and fresh beds.

Outside, these houses rarely need much to look new: paint or limewash on the brick, modern windows, a solid front door, a porch cover, and new beds. When the kitchen, baths, floors, lighting, and exterior all need work, a whole-home remodel lets one crew sequence everything instead of running four separate jobs.

The newer side of town works differently. The EDC’s residential developments list includes Solterra, 1,400 acres planned for 3,400 homes, and Talia, 612 acres along FM 2757 south of I-20 in the Forney school district. New subdivisions usually have a homeowners association, and the EDC notes Valley Brooke plans a professionally managed one. Adding on out there? Book the association’s architectural review before the city permit, and see home additions for how we plan one.

Permits, plan review, health, fire, and the CO

Permits run through the Building Inspection Division, part of Planning and Development Services at 1515 N. Galloway Ave., and everything is filed through the city’s EnerGov self-service portal. Before any permit, every applicant, contractor or homeowner, needs a Mesquite Professional License, backed by the required state license or a photo ID.

The 2024 codes arrived in two waves

Mesquite moved to the 2024 International Building Code and International Fire Code on January 1, 2026, under ordinances the council passed on November 17, 2025. The 2024 editions of the residential, energy, plumbing, mechanical, fuel gas, and existing building codes followed on July 1, 2026, and the 2023 National Electrical Code has applied since January 16, 2025. The adopted codes page links each local amendment.

Two amendments touch almost every commercial job. Under the 2024 building code ordinance, a building with 6,000 square feet or more of building area gets sprinklers throughout, so does an existing one that grows past that mark, and a fire wall doesn’t let you count each side separately. The fire code amendment adds a key box on every occupancy with a fire alarm or sprinkler system, holding keys for each locked door and elevator.

The certificate of occupancy, in the right order

No one can occupy or use a Mesquite space, or even connect utilities, until it has a CO, and a change of owner, business name, or tenant needs a new one. The city’s certificate of occupancy page sets the fee at $125, or folds it into the building permit on a finish-out or remodel, and a $65 reinspection fee can apply if a site fails repeatedly or isn’t ready.

Order matters here. The fire inspection, the health inspection if you serve food, and the backflow inspection if it applies all have to pass before the Building CO inspection can be scheduled. When a building permit is involved, the building final has to land the same day as the CO inspection. Building inspections requested before 4 p.m. can happen the next business day. Fire inspections happen within a 72-hour window.

“The business space must be fully complete and ready for operation at the time of the Building CO Inspection.”

From the City of Mesquite’s certificate of occupancy page.

Restaurants often need power sooner, to run refrigeration for inspection. That takes an Electrical Temporary Release of Utilities permit, applied for by a licensed master electrician, before the city releases temporary power to Oncor.

Restaurants and the Health Division

Food adds the city’s Health Division, at the same Galloway address, which enforces the Texas Food Establishment Rules with local amendments. The annual health permit runs $250 for 1 to 9 employees, $300 for 10 to 19, and $350 for 20 or more. Health inspections are booked by phone, not online, and they have to pass before the Building CO inspection.

Sequencing is where restaurant jobs win or lose weeks. At Pizza Twist, every trade worked to a phased plan set around the restaurant’s hours, because the dining room never closed. See restaurant construction for how we plan a kitchen.

Fire marshal and state accessibility review

The Fire Marshal’s Office runs CO inspections plus hood suppression, sprinkler, and alarm permits through its own portal. A lesson from Allen carries over: at Fade & Style, the fire marshal wanted extra test documentation on a PVC wall system before the CO, and we got it from the supplier without moving the opening date. If a finish is out of the ordinary, ask for its fire test reports before you buy it.

Texas runs its own accessibility check. Once a project’s total estimated cost reaches $50,000, TDLR wants it registered and its construction documents reviewed. Below that line, the work must still comply with the state’s accessibility standards.

Three Mesquite landmarks

The Mesquite Championship Rodeo

The rodeo has run since 1958, and the state legislature named Mesquite the Rodeo Capital of Texas in 1993. The official rodeo site schedules it on Saturday nights in June, July, and August inside the climate-controlled Mesquite Arena near I-635. The city’s Mesquite Arena/Rodeo Entertainment overlay, created in 2006, covers 111.5 acres south and west of Scyene Road and I-635, with the 54-acre Iron Horse Village planned next door.

The Mesquite Rodeo Arena sign on tall black steel posts, with a bucking horse silhouette and neon script lettering against a gray sky The Mesquite Rodeo Arena sign, photographed in 2014.

Opal Lawrence Historical Park

Stephen Decatur Lawrence built three rooms of his farmhouse in 1874. In 1882 a contractor named Charley Florrer added 14 more, and the kitchen and the belvedere tower followed between 1886 and 1900. Lawrence family members lived there until November 1995. The 13-acre park is listed on the National Register of Historic Places and is a Recorded Texas Historical Landmark, right outside downtown.

The white clapboard Lawrence farmhouse at Opal Lawrence Historical Park in Mesquite, with dark green shutters, a cedar shingle roof, and a square belvedere tower The Stephen Decatur Lawrence farmhouse at Opal Lawrence Historical Park.

Florence Ranch Homestead

David and Julia Florence built the first part of their ranch house in 1871 and 1872, two years before the town itself existed. By the 1890s the house had been enlarged and the ranch covered about 730 acres. The family’s descendants gave the homestead to the city in 1987, and the museum now sits on four acres, a story-and-a-half clapboard house with a central chimney and a gallery across the front.

The Florence Ranch Homestead in Mesquite, a white frame farmhouse with a decorated front gallery behind a white picket fence and an iron bell on a black frame Florence Ranch Homestead, Mesquite’s 1871 farmhouse museum.

How a Mesquite project runs with MASACO

Here’s how our six-step process plays out in Mesquite. We walk the suite or house with you and read the lease or survey. You review 3D renderings ahead of any price. Then comes a fixed-scope proposal broken out trade by trade, allowances in writing. During the build, one project manager sends photos and a written update each week, files the Mesquite permits, and books fire, health, backflow, and building inspections in the city’s order. At the end you get as-builts, permits, inspection records, the CO, and warranties, and we’re still a phone call away afterward.

Leasing at Town East, reworking a Gus Thomasson storefront, or opening up a 1970s ranch kitchen? Book a consultation, and we’ll drive down I-635 to see it in person.

Building in Mesquite: what to know.

Mesquite grew from 1,696 residents in 1950 to 55,131 in 1970, and about two thirds of its housing units were built between 1950 and 1989, so a remodel here usually starts with a brick ranch and a lease often means second generation space around Town East Mall, which opened in 1971. New first generation space is coming along I-20 near Trinity Pointe. The City of Mesquite Building Inspection Division at 1515 N. Galloway Ave. issues permits and certificates of occupancy, under the 2024 building and fire codes since January 1, 2026.

Mesquite neighborhoods and districts.

  • Downtown Mesquite
  • Truman Heights
  • Town East
  • Gus Thomasson Corridor
  • Country Club Estates
  • Skyline Logistics Hub
  • Lawson
  • Trinity Pointe
  • Solterra
  • Talia
  • Polo Ridge
  • Ridge Ranch
  • Iron Horse Village

Mesquite on the map.

Open Mesquite, TX in Google Maps

Photo credits

  • Mesquite July 2019 08 (Main Street).jpg by Michael Barera, CC BY-SA 4.0, via Wikimedia Commons.
  • Mesquite July 2019 05 (Broad Street).jpg by Michael Barera, CC BY-SA 4.0, via Wikimedia Commons.
  • Mesquite Rodeo sign (15518803386).jpg by Luis Tamayo from Dallas, Texas, USA, CC BY-SA 2.0, via Wikimedia Commons.
  • Mesquite July 2019 13 (Stephen Decatur Lawrence Farmstead).jpg by Michael Barera, CC BY-SA 4.0, via Wikimedia Commons.
  • Florence Ranch Homestead.jpg by EAmesquite, CC BY-SA 4.0, via Wikimedia Commons.

What we build in Mesquite

Every service, one accountable contractor.

All services
Order counter at Pizza Twist in Irving, a franchise restaurant built by MASACO as general contractor 01

General Contracting

One accountable general contractor for Dallas remodels, additions, and build-outs: design, permits, licensed trades, and a single project manager.

Timelines follow scope: single-room projects often run a few weeks on site, while additions and whole-home work typically run several months.

Explore
Open-plan living and dining room after a whole-home remodel of a 1960s Dallas ranch house: removed walls, vaulted ceiling with beams, white 02

Whole-Home Remodeling

Whole-home remodels for Dallas houses built from the 1920s to the 1990s: opened floor plans, structural work, new systems, and one project manager start to finish.

Whole-home remodels commonly run 4 to 9 months on site depending on structural scope; design, engineering, and permitting add time before demolition.

Explore
Finished modern kitchen remodel in a Dallas home: large island with quartz countertop, flat-panel walnut and painted cabinetry, pendant ligh 03

Kitchen Remodeling

Design-build kitchen remodels across Dallas: new layouts, cabinetry, countertops, lighting plans, and relocated plumbing and electrical, permitted and inspected.

Full kitchen remodels typically run 6 to 10 weeks on site once cabinets and countertops are ordered; design and ordering add several weeks up front.

Explore
Finished primary bathroom remodel: large-format porcelain tile, curbless shower with frameless glass, floating walnut double vanity, warm sc 04

Bathroom Remodeling

Primary and hall bathroom remodels across Dallas: tub-to-shower conversions, wet rooms, proper waterproofing, relocated plumbing on slab, permitted and inspected.

Primary bathroom remodels typically run 4 to 8 weeks on site once tile, glass, and fixtures are in hand; hall baths often run shorter.

Explore
Newly built sunlit family room addition on a North Texas home, seen from the original house through a wide cased opening, matching trim, tal 05

Home & Room Additions

Ground-floor and second-story additions for Dallas homes, designed in 3D, engineered for your slab, and built to match the original brick.

Additions commonly run several months from design approval to move-in, depending on size, engineering, and permit review.

Explore
Exterior of a newly built contemporary custom home in a North Texas suburb at golden hour: limestone and dark standing-seam roof, large glaz 06

Custom Home Building

Design-build custom homes and teardown rebuilds on Dallas infill lots, visualized in 3D and priced by phase before you commit.

Custom homes commonly take a year or more from design through move-in, and teardown lots add demolition and utility work up front.

Explore
Client lounge at Calibration Brain & Body in Frisco, a 4,250 SF commercial build-out by MASACO 07

Commercial Construction & Build-Outs

Interior build-outs and light commercial construction for offices, retail, and medical spaces across Dallas, scheduled around your business hours.

Interior build-outs commonly run a few months from permit to certificate of occupancy, and ground-up light commercial takes considerably longer.

Explore
Fade & Style Barber Shop shop floor in Allen, a shell-to-open tenant improvement by MASACO 08

Tenant Improvements & Interiors

Tenant improvement build-outs for restaurants, franchises, salons, and retail across Dallas-Fort Worth, from shell space to certificate of occupancy.

Most single-tenant build-outs run 5 to 8 weeks on site once permits are in hand

Explore

FAQ

Questions from Mesquite owners.

Let's build what's next

Planning a project in Mesquite?

Call Now