East Main Street in downtown Grand Prairie, Texas, with brick storefronts, the Main Retail and Lofts building, and the Uptown Theatre's red vertical sign under a summer sky

Grand Prairie, TX

General Contractor in Grand Prairie, TX: Suites and Homes

About 40 minutes from our Plano office. Same project manager, same trades, same weekly written update you would get if we were around the corner.

Call (469) 396-4153

Grand Prairie stretches from the Great Southwest Industrial District near I-30 down past Joe Pool Lake to Goodland, south of US 287, and it sits in more counties than most people guess. The Census Bureau’s Vintage 2025 estimates count 209,434 residents as of July 2025: 133,293 in Dallas County, 76,110 in Tarrant County, 26 in Ellis County, and 5 in Johnson County. One permit office covers all of it. The buildings don’t match: warehouses up north, new rooftops by the lake.

We’re MASACO Construction, a woman- and minority-owned general contractor at 7950 Legacy Drive in Plano. Grand Prairie is about 40 minutes away, most of it on the President George Bush Turnpike, which becomes SH 161 down the west side of the city. We haven’t completed a project inside Grand Prairie yet. Our nearest finished work is next door in Irving: Pizza Twist, a 2,000-square-foot franchise restaurant we built out in 6 to 8 weeks, with a full kitchen installation and utility connections phased around service hours so the doors never closed.

Commercial work leads here: restaurant and retail suites, office finish-outs for the aerospace employers, and big stores split into small ones. Home remodeling in Grand Prairie, TX is the other half, from 1950s kitchens to family room additions on 1980s brick houses.

Grand Prairie’s commercial corridors, north to south

The city’s community profile calls Interstate 30 “a strong entertainment and business corridor” and Interstate 20 a road “developing as a significant retail and corporate location.” Here’s what that looks like on the ground.

I-30 and the Great Southwest. Much of the Great Southwest Industrial District’s roughly 80 million square feet lies in Grand Prairie, according to that same profile. The city’s employer list reads like an aerospace directory: Lockheed Martin Missiles and Fire Control headquarters at 5,000 jobs, Bell Textron at 700, Airbus Helicopters at 600, and Safran Helicopters at 530. Around employers like that, the work is office and light industrial tenant improvements: training rooms, restrooms, and offices carved out of warehouse floor.

On Lone Star Parkway, the city has been a builder itself. Grand Prairie Stadium at 1600 Lone Star Parkway was registered with the state as a renovation owned by the City of Grand Prairie: a new natural grass field, changes to the existing seating bowl, sports lighting, and a relocated videoboard, at an estimated $13 million across 79,665 square feet. It’s a cricket ground now.

Grand Prairie Stadium on Lone Star Parkway, a tan masonry stadium entrance under a steel arch reading Grand Prairie, with team banners on two towers and a bronze statue group on the plaza Grand Prairie Stadium at 1600 Lone Star Parkway, converted for cricket in a city-owned renovation.

SH 161 and EpicCentral. The Bush Turnpike’s mainlanes from SH 183 to I-30 opened in 2009, and the stretch from I-30 to I-20 in Grand Prairie followed in 2012, per the NTTA. EpicCentral is a 172-acre entertainment district off SH 161, just north of I-20, and the city’s economic development office announced Topgolf’s January 23, 2026 opening near it, with 300 new jobs on what the city calls its growing 161 corridor. New pads and shells along here are first-generation space. You pay for every wall, duct, and drain.

Pioneer Parkway and the big boxes. This is where Grand Prairie reuses buildings. Asia Times Square opened in late 2007 inside a former Wal-Mart at Pioneer and Great Southwest parkways, and in 2013 its co-owner told NBC DFW the center was adding the former Sam’s Club, about 130,000 square feet, for 250,000 square feet of retail between the two buildings. Splitting a store that size into restaurants, salons, and shops is its own kind of job.

A former big-box store mid-conversion into tenant suites, with tall galvanized metal stud demising walls, an exposed white steel roof deck far above, and new storefront openings cut through a tan block front wall Illustrative: a former big-box store being divided into smaller suites, with new demising walls and storefront openings.

What changes when one store becomes eight suites

The roof usually stays. Nearly everything under it gets multiplied. Each suite needs its own exits, restrooms, HVAC zone, and often its own electrical service, and in Grand Prairie a suite with a separate electrical service files its own certificate of occupancy application. New storefront openings cut into a block or tilt-wall front need engineered headers. The sprinkler layout has to be checked against every new wall.

Before any of that, test for asbestos. The city’s business health guidance says Grand Prairie and the Texas Department of State Health Services require an asbestos survey in public and commercial buildings before renovation or demolition. Our retail and salon build-outs page shows how we plan suites like these.

From Avion Village to Goodland: Grand Prairie’s eras

Grand Prairie grew in jolts, and you can still date a building by its jolt. The Texas State Historical Association counts 1,595 residents in 1940 and about 18,000 by the end of World War II, after North American Aviation’s defense plant peaked at 38,500 workers. Chance Vought moved onto the old plant site in 1948. The census reached 30,386 in 1960, 71,462 in 1980, and 127,427 in 2000.

The wartime housing still stands. Avion Village, at 800 Skyline Road, opened in 1941 with North American Aviation’s civilian employees as its first residents, and the Texas Historical Commission marker says the whole development was finished in 100 days with an on-site prefabrication plant. The city’s landmark designation adds that it was one of eight experimental housing developments built nationwide by the Federal Works Agency, with Richard Neutra on the design team. Its streets carry aviation names: Stearman, Fairchild, Vought, Rickenbacker.

The city also runs a historical neighborhood sign program for subdivisions established in 1952 or earlier. Its list includes Magnolia Park (1941), Indian Hills (1942), and Vought Manor (1949).

Main Street is the other old layer: one- and two-story brick storefronts and the 1950 Uptown Theatre.

West Main Street in downtown Grand Prairie, a row of older one-story red brick storefronts with awnings and a white church steeple rising behind them West Main Street in downtown Grand Prairie, a stretch of older brick storefronts.

Then came the bulk. The Census Bureau’s 2024 American Community Survey counts 71,787 housing units in Grand Prairie with a median year built of 1993. The busiest decade was 2000 to 2009, with 16,693 homes, followed by the 1980s at 11,664 and the 1970s at 10,488. More than half of the city’s homes went up in 1990 or later. Some of the newest sit along Lake Ridge Parkway near Joe Pool Lake, where a Mira Lagos townhome project at South Grand Peninsula Drive was filed with the state with a March 2020 start date.

The city is still adding land. In December 2024 it annexed the first 1,500-plus acres of Goodland, a 5,000-acre community south of US 287 in Ellis and Johnson counties planned for more than 15,000 homes.

What each era means for a project:

  • 1940s to 1960s: small frame and brick houses with old wiring and plumbing, and storefronts never built for a commercial kitchen’s exhaust or grease load.
  • 1970s and 1980s: brick ranch houses on slabs, with low ceilings and closed kitchens, plus strip centers with dated ceilings and storefront systems.
  • 2000s and later: two-story production homes in HOA communities, where the work is finishes, layout, and space rather than repairs.

What Grand Prairie’s permit office will ask for

The Building Inspections Division at 300 West Main Street issues building and trade permits, runs inspections, registers contractors, and issues certificates of occupancy. Filings go through the online Customer Self-Service portal, which made every user re-register after an April 28, 2025 upgrade. General contractor registration costs $75.

Grand Prairie is on the 2021 codes. Its adoption notice put the 2021 International Building, Existing Building, Plumbing, Mechanical, Fuel Gas, Fire, Energy Conservation, and Residential codes in force on January 1, 2022, with regional amendments, and the 2023 National Electrical Code on January 1, 2024.

Any commercial interior finish-out needs a permit. The submittal covers a plot plan with parking, a floor plan showing each room’s use, square footage, and exits, a wall section for interior partitions, and electrical, plumbing, and mechanical plans. The city quotes about 5 to 10 business days to process it. New buildings and shells over 5,000 square feet need engineer-sealed structural, electrical, plumbing, and mechanical plans, and every metal building needs sealed structural plans regardless of size. Inspections requested before 7 a.m. can happen that day. Within 300 feet of homes, construction runs 6 a.m. to 10 p.m.

One rule trips up salons and restaurants that import equipment. The city’s unlisted equipment requirements say a CE marking isn’t proof of compliance. New equipment needs a listing from a recognized US testing lab, like UL or ETL, or a third-party field evaluation.

The certificate of occupancy, suite by suite

Grand Prairie requires a CO before any land, building, or suite is used, and again for a change of use. Single-family homes are exempt. The application asks for the land use questionnaire, a dimensioned floor plan (hand-drawn is fine if it’s legible), a solid waste verification proving trash service, and a health permit if you’ll serve food. Planning, Building Inspections, and Public Health and Environmental Quality each review it, and the city says CO applications are processed in about 3 business days, not counting inspections.

“Operation of a business without a Certificate of Occupancy posted on site is a violation of city ordinance.”

From the City of Grand Prairie’s certificate of occupancy page.

Then come the building inspection, a basic and a technical fire inspection, and a health inspection where it applies. The fire basic checklist is short and exact: a Knox box, a 2A10:BC extinguisher within 75 feet of travel covering no more than 1,500 square feet in retail space, single-action exit hardware with no extra deadbolts, and a current tag on any vent hood. The general compliance list adds 4-inch suite numbers on both the front and back doors. Once you pass, the city sends an electrical release to the utility, and you have 28 days to set up an electric provider before it lapses.

Restaurants: health permit and grease interceptor math

A new or remodeled food business needs a health permit from Public Health and Environmental Quality. Plan review looks at asbestos surveys, cross-connections with the public water supply, industrial waste sample points, and grease traps, and the drawings must show a floor plan, fixture layout, room finish schedule, and plumbing riser diagram. An Environmental Specialist inspects before you open.

The grease interceptor is sized by formula, and the city’s sizing sheet wants the math on your permit drawings. Add up the flow of the three-compartment sink, prep sinks, and dishwasher, multiply by a 7-minute retention time, and round up, because interceptors come in 250-gallon steps. The city’s sample kitchen works out to 1,185.8 gallons and needs a 1,250-gallon unit. Know that number before anyone saws the slab.

Pizza Twist dining area in Irving with long butcher-block communal tables, red stools, a wood slat ceiling hung with greenery, and pendant lights near a glass storefront Nearby in Irving: the Pizza Twist dining area, part of a MASACO restaurant build-out finished while the restaurant kept serving.

Our restaurant construction page goes deeper on kitchens like the one at Pizza Twist.

Fire alarms and fire suppression systems, sprinklers included, go to the Fire Prevention Division as their own permits, processed in about 10 business days. A fire suppression system permit needs shop drawings, cut sheets for all equipment, and hydraulic calculations for water-based systems. Projects with a total estimated cost of $50,000 or more also go to TDLR for accessibility registration and review, and smaller ones still have to meet the Texas Accessibility Standards.

Remodeling Grand Prairie homes from the 1950s to the 2000s

Grand Prairie’s permit list for houses is broad. Residential permits cover remodels, all electrical, plumbing, and mechanical work, foundation repair, fences, and even window and door replacement. The city’s remodel floor plan guide says trade work must be done by a licensed and registered trade contractor unless the homeowner gets permission from the chief electrical or plumbing inspector.

Kitchens. In a 1940s or 1950s house in Vought Manor or Magnolia Park, a kitchen remodel often starts with new circuits and drain lines before a single cabinet goes in. In a 1980s ranch, it’s usually about opening the kitchen to the family room and getting daylight into it. See kitchen remodeling.

Baths. Older baths are small, so the fix is space. Primary baths from the 2000s are big, so the fix is layout, usually trading the tub for a walk-in shower. See bathroom remodeling, or a whole-home remodel when the kitchen, baths, and floors all need work at once.

Additions. Grand Prairie has more than 22,000 homes from the 1970s and 1980s, and the classic upgrade for one is a family room off the back under a vaulted ceiling.

A rear family room addition on a 1980s brick house under construction, with new vaulted rafters tied into the old brick wall, new window openings, and stacked drywall Illustrative: a vaulted family room addition framed onto the back of a 1980s brick house.

The city’s addition requirements are specific: a site plan with setbacks, a foundation plan designed and sealed by a Texas-registered engineer, an energy code compliance report such as REScheck, and braced wall design that’s either engineered or meets Chapter 6 of the residential code. The joint between the new roof and the old brick wall is the detail to settle on paper first. More on home additions.

HOAs come next. The city’s homeowners association directory runs from several Westchester associations and Lake Parks East, North, and West to Mira Lagos, Grand Peninsula, and the Property Owners of Lake Ridge. If yours reviews exterior changes, that approval goes on the schedule before the permit.

Racetrack, theater, and lake: three local landmarks

Lone Star Park

Lone Star Park ran its first race on April 17, 1997, and drew a record crowd of more than 53,700 for the 2004 Breeders’ Cup, according to a Texas House resolution marking its 20 years of racing. Its seven-level, glass-enclosed grandstand stands at 1000 Lone Star Parkway, on the same road as the cricket stadium.

Lone Star Park's domed tan grandstand building in Grand Prairie under a clear blue sky, with trees and tall light poles in front The Lone Star Park grandstand at 1000 Lone Star Parkway.

The Uptown Theatre

In 1948, when the Silver family arrived to run movie houses on Main Street, Grand Prairie had 13,241 people. Their Uptown opened on March 17, 1950, as a first-run theater with 1,000 seats and a small stage. The city bought it in 2005, hired San Antonio architect Killis Almond to restore it as a live performance venue, and reopened it in 2008, per the city’s historical marker text.

The Uptown Theatre on Main Street in Grand Prairie, a yellow brick Art Deco facade with a tall maroon vertical sign, a lit marquee, and wood entry doors The Uptown Theatre at 120 East Main Street, restored by the city and reopened in 2008.

Joe Pool Lake

The U.S. Army Corps of Engineers describes Joe Pool Lake as a 7,400-acre lake shared by Grand Prairie, Dallas, Cedar Hill, Mansfield, and Midlothian, with impoundment starting in January 1986. It’s one of the few Texas lakes that drains north. Loyd Park and Lynn Creek Park are two of its four developed parks.

Aerial view of Joe Pool Lake and its earthen dam, with a road along the dam crest, green shoreline, and open water reaching to the horizon Joe Pool Lake and its dam in a U.S. Army Corps of Engineers aerial photograph.

Working with MASACO on a Grand Prairie job

Every project follows the six steps on our process page, adjusted for what Grand Prairie asks for:

  1. Understand. We walk the suite or the house with you.
  2. Visualize. You see 3D renderings before anything is priced.
  3. Plan. A fixed-scope proposal organized by trade, with allowances, and the grease interceptor size, the CO path, and any HOA review written in.
  4. Execute. One project manager, a written photo update every week, and the portal filings with Building Inspections, Fire Prevention, and Public Health handled.
  5. Deliver. As-builts, permits, inspection records, the CO, and warranties in one close-out package.
  6. Support. We stay a phone call away after you open or move back in.

A former big box on Pioneer Parkway, a pad site near EpicCentral, a 1980s house that needs a family room: book a consultation. We’ll come down the Bush Turnpike, walk it with you, and tell you what Grand Prairie will ask for before you sign anything.

Building in Grand Prairie: what to know.

Grand Prairie's 209,434 residents (Census estimate, July 2025) live almost entirely in Dallas and Tarrant counties, and more than half of the city's homes were built in 1990 or later. Commercial space runs from the Great Southwest Industrial District and the I-30 entertainment corridor to EpicCentral on SH 161 and the converted big-box centers on Pioneer Parkway. The Building Inspections Division at 300 West Main Street issues permits and certificates of occupancy under the 2021 International Codes.

Grand Prairie neighborhoods and districts.

  • Downtown Grand Prairie
  • Great Southwest Industrial District
  • EpicCentral
  • Asia Times Square
  • Avion Village
  • Vought Manor
  • Magnolia Park
  • Westchester
  • Lake Parks
  • Lynn Creek Hills
  • Lake Ridge
  • Mira Lagos
  • Grand Peninsula
  • Goodland

Grand Prairie on the map.

Open Grand Prairie, TX in Google Maps

Photo credits

  • Grand Prairie May 2019 22 (E Main Street).jpg by Michael Barera, CC BY-SA 4.0, via Wikimedia Commons.
  • Grand Prairie Stadium exterior, April 2024.jpg by SounderBruce, CC BY-SA 4.0, via Wikimedia Commons.
  • Grand Prairie May 2019 24 (W Main Street).jpg by Michael Barera, CC BY-SA 4.0, via Wikimedia Commons.
  • Lone Star Park.jpg (cropped) by Jax 0677, CC BY-SA 4.0, via Wikimedia Commons.
  • Grand Prairie May 2019 23 (Uptown Theater).jpg (cropped) by Michael Barera, CC BY-SA 4.0, via Wikimedia Commons.
  • USACE Joe Pool Lake and Dam.jpg by U.S. Army Corps of Engineers, photographer not specified or unknown, Public domain, via Wikimedia Commons.

What we build in Grand Prairie

Every service, one accountable contractor.

All services
Order counter at Pizza Twist in Irving, a franchise restaurant built by MASACO as general contractor 01

General Contracting

One accountable general contractor for Dallas remodels, additions, and build-outs: design, permits, licensed trades, and a single project manager.

Timelines follow scope: single-room projects often run a few weeks on site, while additions and whole-home work typically run several months.

Explore
Open-plan living and dining room after a whole-home remodel of a 1960s Dallas ranch house: removed walls, vaulted ceiling with beams, white 02

Whole-Home Remodeling

Whole-home remodels for Dallas houses built from the 1920s to the 1990s: opened floor plans, structural work, new systems, and one project manager start to finish.

Whole-home remodels commonly run 4 to 9 months on site depending on structural scope; design, engineering, and permitting add time before demolition.

Explore
Finished modern kitchen remodel in a Dallas home: large island with quartz countertop, flat-panel walnut and painted cabinetry, pendant ligh 03

Kitchen Remodeling

Design-build kitchen remodels across Dallas: new layouts, cabinetry, countertops, lighting plans, and relocated plumbing and electrical, permitted and inspected.

Full kitchen remodels typically run 6 to 10 weeks on site once cabinets and countertops are ordered; design and ordering add several weeks up front.

Explore
Finished primary bathroom remodel: large-format porcelain tile, curbless shower with frameless glass, floating walnut double vanity, warm sc 04

Bathroom Remodeling

Primary and hall bathroom remodels across Dallas: tub-to-shower conversions, wet rooms, proper waterproofing, relocated plumbing on slab, permitted and inspected.

Primary bathroom remodels typically run 4 to 8 weeks on site once tile, glass, and fixtures are in hand; hall baths often run shorter.

Explore
Newly built sunlit family room addition on a North Texas home, seen from the original house through a wide cased opening, matching trim, tal 05

Home & Room Additions

Ground-floor and second-story additions for Dallas homes, designed in 3D, engineered for your slab, and built to match the original brick.

Additions commonly run several months from design approval to move-in, depending on size, engineering, and permit review.

Explore
Exterior of a newly built contemporary custom home in a North Texas suburb at golden hour: limestone and dark standing-seam roof, large glaz 06

Custom Home Building

Design-build custom homes and teardown rebuilds on Dallas infill lots, visualized in 3D and priced by phase before you commit.

Custom homes commonly take a year or more from design through move-in, and teardown lots add demolition and utility work up front.

Explore
Client lounge at Calibration Brain & Body in Frisco, a 4,250 SF commercial build-out by MASACO 07

Commercial Construction & Build-Outs

Interior build-outs and light commercial construction for offices, retail, and medical spaces across Dallas, scheduled around your business hours.

Interior build-outs commonly run a few months from permit to certificate of occupancy, and ground-up light commercial takes considerably longer.

Explore
Fade & Style Barber Shop shop floor in Allen, a shell-to-open tenant improvement by MASACO 08

Tenant Improvements & Interiors

Tenant improvement build-outs for restaurants, franchises, salons, and retail across Dallas-Fort Worth, from shell space to certificate of occupancy.

Most single-tenant build-outs run 5 to 8 weeks on site once permits are in hand