Burleson City Hall's red brick front and the lawn of Mayor Vera Calvin Plaza, with a red interurban parlor car under a covered pavilion on the right

Burleson, TX

General Contractor in Burleson, TX: Old Town to I-35W

About 70 minutes from our Plano office. Same project manager, same trades, same weekly written update you would get if we were around the corner.

Call (469) 396-4153

Burleson’s September 2026 permit report reads like a cross-section of the city. A new Southside Bank branch on Northwest John Jones Drive. Two remodels on Highpoint Parkway, in the business park along I-35W. Three amenity buildings at Chisholm Summit, the master-planned community on the west side. A CO application for a pizza, pasta, and sub shop on West FM 917.

That mix is our work. MASACO Construction is a woman- and minority-owned general contractor working out of Plano’s Legacy West area, commercial first, with homeowners served too. Straight answer on distance: Burleson is about 70 minutes from our office, past Fort Worth.

No Burleson project is in our portfolio yet. The nearest one sits about 30 miles northeast in Irving: Pizza Twist, a franchise restaurant of 2,000 square feet. Over 6 to 8 weeks we installed its kitchen and utility hookups while it kept serving, with the work phased around its open hours.

Pizza Twist in Irving with a light wood order counter, green booths, string lights across a dark ceiling, and a pizza mural on the side wall Pizza Twist in Irving, MASACO’s nearest finished project to Burleson; the restaurant stayed open through its build-out.

Two counties, 56,907 people, and a railroad town

By the Census Bureau’s Vintage 2025 count, 56,907 people lived in Burleson in July 2025, 46,460 of them in Johnson County and 10,447 in Tarrant. For 2000, the Handbook of Texas gives 20,976. That’s more than 35,000 new residents in 25 years.

The Missouri, Kansas and Texas Railroad put a depot here in 1881 on land bought from Rev. Henry C. Renfro, who named it for his teacher, Dr. Rufus C. Burleson. The population nearly tripled between 1950 and 1960 as Burleson became a Fort Worth suburb. Whichever county your lot is in, permits and the CO run through the city.

I-35W and Wilshire Boulevard: where the suites are

Burleson has more than nine miles of interstate frontage, according to the Burleson EDC. City zoning wraps the interstate in an IH35 overlay reaching 500 feet from each side of the right of way, with five plan areas: Spinks, East Renfro Street and Hurst Road, the Hidden Creek Destination Center, a business park, and the FM 917 interchange.

The business park is Highpoint. The EDC describes Highpoint Business Park as 230 acres on both sides of the interstate, home to tenants like Golden State Foods, McLane, and Wagner-Smith Equipment.

Hidden Creek Parkway is where newer multi-tenant buildings are filling. At 309 West Hidden Creek Parkway, the city issued shell completion permits in July 2026 for Murphy’s Law Brewery & Pizzeria and Belle Visage. The pizzeria’s took a little over nine weeks from submittal to approval. Plan on a window like that for a food use.

Then there’s SH 174. The city’s 174 Corridor Plan calls the highway, “also known as Wilshire Boulevard,” one of Burleson’s major commercial arterials, and its photo survey runs past strip centers like Wilshire Plaza down to Burleson Commons. The EDC’s retail page lists Burleson Commons as anchored by Kroger Marketplace and Premiere Cinemas, and South Towne Shopping Center by Target and Home Depot.

Wilshire is about to get wider. A TxDOT project filed with the state will widen SH 174 from four lanes to six between Wicker Hill and north of Elk Drive, dated August 2026 to June 2028. Leasing there? Ask how your driveway fares during construction.

Medical work shows up along the freeway and Alsbury Boulevard. Texas Health Huguley Hospital Fort Worth South, at 11801 South Freeway with a Burleson address, opened in 1977 and is licensed for 291 beds. The city permitted a $5.2 million Huguley clinic on Southwest Alsbury Boulevard in November 2025, and a neurology practice applied for a CO on Northwest John Jones Drive in September 2026. That’s where our medical and wellness build-outs fit.

A used bank branch is its own kind of suite

Southside Bank’s new branch at 440 Northwest John Jones Drive carries a permit valuation of about $1.9 million, and the bank applied for its CO on September 30, 2026. Taking over an older branch means inheriting a vault, a teller line, drive-through lanes, and security wiring.

Burleson’s IH35 overlay allows banks by right in every plan area, and the parking table asks a bank for one space per 300 square feet, against one per 200 for offices and clinics. Convert a branch to either and you can come up short on parking. We run that math before you sign.

A bank branch interior mid refit with the teller counter demolished, new steel stud offices partly faced in drywall, gray floor protection, and a round stainless vault door left open in a beige wall Illustrative: an older bank branch mid refit, with the teller line gone, consultation offices framed in steel studs, and the vault door left in place.

A branch refit is mostly tenant improvement demolition and rerouting. Pull the teller millwork, cap the dead conduit, frame the offices, and decide early what happens to the vault. Moving one is its own structural project, so most refits design around it.

Shell completion or remodel?

Burleson’s permit reports list “shell completion” apart from “remodel.” A shell completion finishes a new, empty suite, like Behavioral Innovations at 1660 Candler Drive this summer. A remodel reworks someone else’s build-out: Kidstrong’s suite at 1185 North Burleson Boulevard was approved 20 days after submittal, and the gym applied for its CO in late September.

Old Town: an overlay, a review board, and new restaurants

Old Town is Burleson’s oldest commercial district, with more than 15 dining options and two bakeries by the EDC’s count. Recent permits in and around it: a $1.1 million new building for Capone’s at 136 West Bufford Street, an orthodontic office remodel at 109 West Renfro Street, and a sweets shop’s shell completion at 119 Southwest Anderson Street.

Building here adds a step. Burleson’s zoning regulations put Old Town under an overlay meant to keep its historic character, with a central core bounded by Renfro, Dobson, Bufford, and Johnson streets and Southeast Tarrant Avenue. New construction, and any renovation whose structural work in one calendar year tops 50 percent of the Johnson County Appraisal District value, has to follow the Burleson Old Town Design Standards. The commercial permit guide also requires Old Town Review Board approval before a building permit issues.

Three overlay rules that come up often:

  • House to shop. In the overlay’s retail and commercial districts, a house can go commercial if its kitchen, bathrooms, and garage stay usable, with only monument or nameplate signs.
  • Sidewalk seating. Restaurants can add permanent sidewalk seating if it’s on the site plan, meets ADA requirements, and carries liability coverage of at least $500,000 per occurrence and $1,000,000 aggregate.
  • Signs. Pole signs only along Renfro Street. A-frame sidewalk signs up to eight square feet a side, if they don’t block foot traffic.

A street in Old Town Burleson with a low storefront row under a flat metal canopy on the left and brick commercial buildings on the right, cars parked nose in on both sides Old Town Burleson in 2013: a canopied storefront row on one side of the street and brick commercial buildings on the other.

Burleson’s building stock, from a 1936 gym to 2000s brick

Burleson had fewer than 800 residents in 1950, so its prewar buildings are few. The Burleson Gymnasium near East Ellison and South Clark streets shows what decades do. Living New Deal records it as a Public Works Administration project dedicated in October 1936, with a 122-by-68-foot auditorium. A 1977 remodel boarded over its windows and added air conditioning.

That’s the pattern: an older building here has usually been changed once already, and the last change is what you’re working with.

The south side of the 1936 Burleson Gymnasium with a white barrel roof, corrugated metal gable, painted block walls, and long metal panels along the upper wall The south side of the 1936 Burleson Gymnasium, a Public Works Administration building remodeled in 1977.

Older commercial space needs paperwork first. Burleson wants an asbestos survey affidavit with any remodel or demolition permit for a public or commercial building, under state Senate Bill 509. No survey yet? The owner gets one before the permit issues.

Houses follow the population curve. The EDC says the vast majority of Burleson homes were built in 2000 or later. New ones keep coming, fewer and bigger: 372 single-family permits in fiscal 2020, 114 in fiscal 2026, with the 2026 houses averaging about 3,705 square feet in subdivisions like Bear Ridge, High Country, and The Parks at Panchasarp Farms.

West of town the scale jumps. The city calls Chisholm Summit its first master-planned community: about 3,066 homes at build-out, more than 100 acres of parkland, 28 acres of commercial space, and a 106-acre office park and medical district. Water there comes from the Johnson County Special Utility District, so confirm utility providers before a pad site goes to design. The city has also announced Tallgrass: more than 621 acres at Chisholm Trail Parkway and FM 1902, planned for about 4,000 homes and 1 million square feet of commercial space.

Permits, fire review, and the CO in Burleson

Where to file. Building Permits and Inspections sits at 135 West Ellison Street, Suite 109. Inspectors work 7:30 a.m. to 4 p.m. on weekdays.

Code edition. Burleson has enforced the 2021 international codes, as locally amended, plus the 2020 National Electrical Code, since November 2, 2023. It has reviewed the 2024 codes and the 2023 NEC, with a public hearing on November 9 and a second reading on December 14, 2026. If adopted, they take effect January 1, 2027, so drawings started this fall should be checked against both.

Commercial plan sets. Burleson’s commercial permit guide asks for TDLR registration, a statement of special inspections, a soil report affidavit, an energy compliance report, and engineer-sealed structural and MEP drawings. First review takes up to 20 business days; resubmittals, up to 10. Signs, fire alarms, suppression systems, and health permits are separate. The same guide rates local termite exposure “very heavy,” which matters for every wood-framed wall you add.

Fire review starts with a consultant. Fire code drawings go to an approved third-party reviewer before the Fire Marshal’s office sees them, and the city’s notice lists the approved firms. It cites the fire code section that has the owner provide that report “without charge to the jurisdiction.”

Your fire drawings reach a private reviewer before they reach the city. Budget for it, and schedule it.

Food. Restaurants email plans to the city’s Environmental Services before extensive remodeling or construction. The plan review application lists no fee up to 500 square feet, $50 up to 3,000, and $100 above that. The city follows the 2017 FDA Food Code, and a food permit doesn’t transfer to a new owner. More on kitchens on our restaurant construction page.

The CO. Burleson requires a certificate of occupancy for a new building, owner, use, or tenant, a remodeled space, and even a new business name. The owner or tenant applies, and it issues after every inspecting department approves and Building Inspections and the Fire Marshal sign the building final. The application adds two items people miss: a water and wastewater survey Public Works must approve, and possible roadway impact fees, paid before the certificate issues.

The city’s common CO corrections are specific:

  • Address numbers at least 6 inches tall, and 4-inch suite numbers on a multi-tenant building’s rear door
  • A clear 36 inches in front of electrical panels and 18 on each side, marked on the floor or posted
  • A 5-pound ABC extinguisher per 1,500 square feet, plus a Class K unit in a commercial kitchen

Jobs at $50,000 and up also need state registration and an accessibility plan review under TDLR’s rules.

Remodeling a Burleson house built after 2000

A house from Burleson’s early 2000s boom is now past 20: sound structure, tired finishes. Kitchen remodeling here tends to mean new cabinets, counters, and lighting. Bathroom remodeling usually starts with the primary bath. When it’s everything at once, one whole-home remodel with a single permit and schedule is simpler than three jobs.

Want more room without an addition? Look at the attached garage. Turning a two-car garage into a game room usually means:

  • Infilling the door opening. Frame it, often as a window wall, and tie it into the brick or siding.
  • Leveling and insulating. Garage slabs usually sit lower than the house and slope toward the door, so the floor gets built up and the shell insulated like living space.
  • Conditioning it. Extend the ductwork or add a dedicated system.
  • Keeping the parking. Burleson’s zoning requires two off-street spaces per house in its single-family districts, so we confirm the lot still has them before we design.

A former two-car garage finished as a game room with a black-framed window wall where the garage door was, pale oak vinyl plank floors, a walnut pool table, and a charcoal sectional Illustrative: an attached two-car garage in a 2000s house finished as a game room, with a window wall where the garage door used to be.

Burleson’s permit information page says remodels and structural, mechanical, electrical, or plumbing repairs generally need permits, and so do window replacements and water heaters. Painting, carpet, wallpaper, cabinets, and trim don’t. The city’s forms list includes a 2021 IECC residential compliance path at submittal and an energy testing form at final. We insulate a conversion as if both apply.

Residential review is quick: September 2026’s eight residential plan submittals averaged three days, and inspections called in before 8 p.m. happen the next business day.

The city’s handout on choosing a contractor asks the right question:

“Ask the contractor if they are pulling the appropriate permits for the job and if it will be inspected. If they say NO, it should be a RED FLAG.”

We pull them. Every time.

Three Burleson landmarks locals know

The hero photo above shows City Hall and Mayor Vera Calvin Plaza, a one-acre plaza the EDC says was funded with TIF and 4B money. The red car under the pavilion is Parlor Car #411, which reached its permanent home in front of City Hall on October 6, 2012.

The interurban depot on West Ellison Street

From 1912 to 1931, North Texas Traction Company cars stopped here on the Fort Worth to Cleburne line. The marker at the door says the brick depot was the first building in Burleson with electricity and housed the Burleson Dispatcher from 1935 to 1985. It’s now the city-owned Burleson Museum and Visitors Center, run by the Burleson Heritage Foundation. Beside it sits Interurban Express Motor #330, a freight car that returned to Old Town in March 2010.

The restored brick interurban depot in Burleson with a BURLESON sign over glass double doors, globe street lamps, wooden benches, and an orange rail car at the left edge The restored interurban depot at 124 West Ellison Street, now the Burleson Museum and Visitors Center, with the orange #330 car at left.

The Renfro-Clark House on North Clark Street

The town’s name started with this family. Henry C. Renfro provided land for the M.K.T. line and won the right to name the town for his friend, Dr. Rufus Burleson. His widow and her only daughter, Margaret Annette Baker Clark, built this house at 128 North Clark Street in 1894, the first in the Clark addition. Its state marker designates it a Recorded Texas Historic Landmark. It’s private property; enjoy the turret from the sidewalk.

The Renfro-Clark House in Burleson, a white Victorian frame house with a copper-clad turret, scrollwork porch brackets, an oval window, and a Texas historical marker among blooming shrubs The Renfro-Clark House at 128 North Clark Street, built in 1894 and now a Recorded Texas Historic Landmark.

How a Burleson project runs from Plano

Seventy minutes each way shapes the plan, so we stack site visits around Burleson’s inspection hours. The first walk-through settles the local questions: Old Town overlay or IH35 overlay, shell or second generation, city water or a utility district. Then come 3D renderings, so you approve the look before any number exists. Our fixed-scope proposal is organized trade by trade, allowances spelled out, with the local items already in it: third-party fire review, asbestos survey, TDLR registration, food plan review, roadway impact fees.

During construction, a single project manager owns your job and writes you a photo update weekly. Handover means one close-out package: as-built drawings, the permit and inspection sign-offs, your certificate of occupancy, and warranties. And we still pick up the phone afterward. Our process page has every step. Site actually inside Fort Worth’s city limits? Our Fort Worth page covers that city’s rules.

Refitting a bank branch on John Jones Drive, opening a restaurant off Hidden Creek Parkway, or finally finishing that garage? Book a consultation. Send a floor plan or phone photos of the space, and we’ll answer with renderings and a fixed scope.

Building in Burleson: what to know.

Burleson grew from 20,976 residents in 2000 to 56,907 by July 2025, and its economic development corporation says the vast majority of its homes were built in 2000 or later, while Old Town still has the brick interurban depot where interurban cars stopped from 1912 to 1931. Commercial space follows I-35W, where the 230-acre Highpoint Business Park sits on both sides of the interstate, and SH 174, which runs through town as Wilshire Boulevard. The Building Permits and Inspections office at 135 West Ellison Street issues permits and certificates of occupancy under the 2021 international codes and plans to enforce the 2024 editions on January 1, 2027 if the City Council adopts them.

Burleson neighborhoods and districts.

  • Old Town Burleson
  • Clark Addition
  • Bear Ridge
  • Silo Mills
  • Shannon Creek
  • High Country
  • Reverie
  • The Parks at Panchasarp Farms
  • Chisholm Summit
  • Highpoint Business Park
  • Hidden Creek Parkway
  • Wilshire Boulevard (SH 174)
  • Burleson Commons
  • South Towne Shopping Center

Burleson on the map.

Open Burleson, TX in Google Maps

Photo credits

  • BTX City Hall & Mayor Vera Calvin Plaza.jpg by Jetorres0405, CC BY-SA 4.0, via Wikimedia Commons.
  • Section of downtown Burleson, TX IMG 7088.JPG by Billy Hathorn, CC BY-SA 3.0, via Wikimedia Commons.
  • Burleson Gymnasium South Elevation 2018.jpg by Larry D. Moore, CC BY 4.0, via Wikimedia Commons.
  • Burleson, TX, Train Station restored IMG 7083.JPG by Billy Hathorn, CC BY-SA 3.0, via Wikimedia Commons.
  • Renfro-Clark House Burleson (1 of 2).jpg by Renelibrary, CC BY-SA 4.0, via Wikimedia Commons.

What we build in Burleson

Every service, one accountable contractor.

All services
Order counter at Pizza Twist in Irving, a franchise restaurant built by MASACO as general contractor 01

General Contracting

One accountable general contractor for Dallas remodels, additions, and build-outs: design, permits, licensed trades, and a single project manager.

Timelines follow scope: single-room projects often run a few weeks on site, while additions and whole-home work typically run several months.

Explore
Open-plan living and dining room after a whole-home remodel of a 1960s Dallas ranch house: removed walls, vaulted ceiling with beams, white 02

Whole-Home Remodeling

Whole-home remodels for Dallas houses built from the 1920s to the 1990s: opened floor plans, structural work, new systems, and one project manager start to finish.

Whole-home remodels commonly run 4 to 9 months on site depending on structural scope; design, engineering, and permitting add time before demolition.

Explore
Finished modern kitchen remodel in a Dallas home: large island with quartz countertop, flat-panel walnut and painted cabinetry, pendant ligh 03

Kitchen Remodeling

Design-build kitchen remodels across Dallas: new layouts, cabinetry, countertops, lighting plans, and relocated plumbing and electrical, permitted and inspected.

Full kitchen remodels typically run 6 to 10 weeks on site once cabinets and countertops are ordered; design and ordering add several weeks up front.

Explore
Finished primary bathroom remodel: large-format porcelain tile, curbless shower with frameless glass, floating walnut double vanity, warm sc 04

Bathroom Remodeling

Primary and hall bathroom remodels across Dallas: tub-to-shower conversions, wet rooms, proper waterproofing, relocated plumbing on slab, permitted and inspected.

Primary bathroom remodels typically run 4 to 8 weeks on site once tile, glass, and fixtures are in hand; hall baths often run shorter.

Explore
Newly built sunlit family room addition on a North Texas home, seen from the original house through a wide cased opening, matching trim, tal 05

Home & Room Additions

Ground-floor and second-story additions for Dallas homes, designed in 3D, engineered for your slab, and built to match the original brick.

Additions commonly run several months from design approval to move-in, depending on size, engineering, and permit review.

Explore
Exterior of a newly built contemporary custom home in a North Texas suburb at golden hour: limestone and dark standing-seam roof, large glaz 06

Custom Home Building

Design-build custom homes and teardown rebuilds on Dallas infill lots, visualized in 3D and priced by phase before you commit.

Custom homes commonly take a year or more from design through move-in, and teardown lots add demolition and utility work up front.

Explore
Client lounge at Calibration Brain & Body in Frisco, a 4,250 SF commercial build-out by MASACO 07

Commercial Construction & Build-Outs

Interior build-outs and light commercial construction for offices, retail, and medical spaces across Dallas, scheduled around your business hours.

Interior build-outs commonly run a few months from permit to certificate of occupancy, and ground-up light commercial takes considerably longer.

Explore
Fade & Style Barber Shop shop floor in Allen, a shell-to-open tenant improvement by MASACO 08

Tenant Improvements & Interiors

Tenant improvement build-outs for restaurants, franchises, salons, and retail across Dallas-Fort Worth, from shell space to certificate of occupancy.

Most single-tenant build-outs run 5 to 8 weeks on site once permits are in hand

Explore

FAQ

Questions from Burleson owners.

Let's build what's next

Planning a project in Burleson?