Main Street in historic downtown Grapevine, Texas, looking south past Wall Street, with red brick storefronts, the Palace Theatre sign, and the City Hall clock tower topped by the Nightwatchman statue

Grapevine, TX

General Contractor in Grapevine, TX: Main Street to SH 114

About 35 minutes from our Plano office. Same project manager, same trades, same weekly written update you would get if we were around the corner.

Call (469) 396-4153

Grapevine is close to finished. The city’s economic development office says Grapevine went from roughly 20% developed in the 1970s to well above 90% built out today. The Census Bureau’s July 2025 estimate puts the city at 50,714 residents, within a hundred of its 2020 base. So building here mostly means rebuilding. A suite turning over near Grapevine Mills. A brick storefront on Main Street older than anyone who walks past it. A 1987 house in Woods Addition that still has its first kitchen.

We’re a commercial-first general contractor with a full residential practice, based on Legacy Drive in Plano, about 35 minutes from downtown Grapevine by SH 121. We haven’t finished a project inside Grapevine’s city limits yet, so here’s the nearest work we can show you. South of the airport, we built Pizza Twist in Irving, a 2,000-square-foot franchise restaurant, in six to eight weeks while it kept serving customers.

What makes Grapevine unusual is the pairing. A protected historic core where exterior work needs the city’s preservation sign-off, and an airport hospitality economy a few minutes away. Some projects touch both.

Historic Main Street, Grapevine Mills, and the airport edge

Main Street and Grapevine Main

The Grapevine Commercial Historic District, listed in the National Register, runs along South Main Street from Northwest Highway to West College Street, according to the city’s preservation office. The visitors bureau counts more than 80 locally owned shops, restaurants, winery tasting rooms, boutiques, and galleries along it. Grapevine bills the street as home to the original Urban Wine Trail, with every tasting room within walking distance of the next.

The biggest recent change sits at Main Street and Dallas Road, where Grapevine Main Station is a $114 million transit-oriented development: a 42,000-square-foot station serving TEXRail and the Grapevine Vintage Railroad, the Harvest Hall food hall, a 38,000-square-foot plaza, and Hotel Vin, a six-story, 120-room hotel.

Grapevine Mills and the SH 121 side

Grapevine Mills is the city’s other retail anchor, with about 180 stores in 1.8 million square feet and Bass Pro Shops Outdoor World across the road, per the visitors bureau. TxDOT later added two below-grade lanes each way on FM 2499 from SH 121 to Denton Creek, so through traffic bypasses the intersections at Stars and Stripes Way and Grapevine Mills Boulevard. Most of what you’ll tour here is second generation: mall suites and pad buildings already finished out for someone else, sometimes twice.

SH 114, SH 121, and hotel country

DFW Airport sits partly inside Grapevine’s city limits, and the highways feeding its north entrance cut straight through town. TxDOT’s DFW Connector rebuilt 8.4 miles of SH 114 and SH 121 in Grapevine, Southlake, and Irving for an initial $1 billion, finished in March 2014, and doubled the highway system around that entrance.

The hotels sit along the same roads. The visitors bureau counts 20 hotels in the city, more than 11,000 rooms within 15 minutes of Historic Main Street, and over a million square feet of meeting space, nearly half of it at the Gaylord Texan Resort & Convention Center. The city’s economic development team estimated 7 million visitors in 2021. Offices came too: Kubota opened its North American headquarters in 2017 on 185 untouched acres in northeast Grapevine, on a road it got to name Kubota Way, and GameStop’s headquarters and a Paycom campus are here as well.

For a contractor, that economy means restaurants, service retail, and office suites in buildings that change tenants often. That’s tenant improvement work: fitting an existing suite to a new tenant.

The Entry 4 entrance at Grapevine Mills, a long white mall wall with a green entry sign beside a tall steel ring sculpture over the doors Entry 4 at Grapevine Mills, the 1.8-million-square-foot mall near SH 121 and FM 2499.

Inside a Main Street building from before 1920

The city’s own Main Street design guidelines explain these buildings. Main Street’s first stores were wood frame. Brick buildings of one and two stories replaced them in the late 19th century and the first two decades of the 20th. Most are three bays wide, with brick cornices, sign bands framed by brick piers, and often cast-iron storefronts. The street fronts are mostly unpainted red brick with corbelled and dentilled parapets, while the rear walls are utilitarian and have mostly been altered and rebuilt.

The guidelines also say, flatly, that most interiors have been altered over the years. That’s the build-out problem in one line. Open the ceiling and you can find three generations of wiring and a joist somebody doubled up decades ago.

Here’s what that means when you lease one:

  • Sprinklers. Grapevine’s amended building code requires sprinklers throughout any building of 6,000 square feet or more, including an existing building enlarged to that size, and fire walls don’t split a building into smaller ones for this rule. Take the space next door and you may cross that line.
  • Engineering. The city’s commercial checklist says structural, mechanical, electrical, and plumbing plans typically need a Texas engineer’s seal when that work happens in a building over 5,000 square feet.
  • Power. Each lease space gets no more than one electrical service.
  • Change of use. Moving to a more intense use, like a house becoming an office, means the whole building gets upgraded for the new use.

Wine adds its own step. Grapevine’s certificate of occupancy policy lists wineries and wine tasting, alcohol sales and service, outdoor dining, and food service in the Central Business District as conditional uses. If the property doesn’t already hold a conditional use permit, you need Planning and City Council approval through a public hearing, which the city says typically takes 45 days or longer. One tasting room on the visitors bureau’s list operates in one of Grapevine’s oldest historic homes, a reminder that zoning, change of occupancy, and historic review can all land on one schedule.

A finished wine tasting room in an early 1900s brick storefront with exposed red brick walls, a long white oak bar, a steel and walnut wine wall, and amber glass pendant lights Illustrative: a tasting room fitted into an early 1900s brick storefront, the building type that lines Main Street.

Grapevine houses, from 1870s cottages to 1990s subdivisions

Downtown’s residential blocks are older than most North Texas suburbs. The Original Town Historic District, also on the National Register, sits east of South Main Street between East Wall Street and East College Street. College Street was built up with houses from the 1870s through the 1970s, and most still sit on their original lots. Grapevine’s residential style guide lists what you’ll find on those blocks: vernacular cottages and Queen Anne houses from the late 1800s, Arts and Crafts bungalows from 1905 into the 1920s, Tudor and Classical Revival houses, minimal traditional cottages from 1935 into the 1950s, and 1950s and 1960s ranches.

Two wood-frame houses in Grapevine's Original Town Residential Historic District, a sage green hipped-roof cottage with a recessed porch and a pale blue gabled house beside it Houses in the Original Town Residential Historic District, east of South Main Street.

Then the farmland filled in. Community Impact’s neighborhood profiles trace the wave: Woods Addition built out in 1987 with about 224 homes averaging 1,608 square feet. Shadow Glen, about 376 homes at 2,240 square feet, and Countryside Estates, about 412 homes, both finished in 1994. Winding Creek followed in 1997, then Western Oaks in 1999 at an average of 3,047 square feet. The pattern is plain. The older the subdivision, the smaller the house, and the more likely the owner wants to open it up or add on.

Permits, plan review, and the CO in Grapevine

Building Services, at 200 South Main Street, handles permits, plan review, and inspections. In August 2026 the city moved contractor registration and permit applications to a new OpenGov portal. General contractors register for $75; electrical, plumbing, and mechanical contractors register free.

Grapevine is still on the 2021 codes. Since January 1, 2024, it has enforced the 2021 International Building, Residential, Plumbing, Mechanical, Fuel Gas, and Fire Codes and the 2020 National Electrical Code. The city’s target turnaround times are same day for simple trade permits, 7 to 10 business days for residential remodels, additions, and commercial alterations, and 10 business days for new commercial buildings.

More work needs a permit here than people expect. The city’s permit guide lists window replacement, siding replacement, new circuits, extra fixtures on an existing circuit, new plumbing fixtures, and water heaters. Painting, tile, carpet, cabinets, and countertops are exempt, and so are movable partitions no taller than 5 feet 9 inches.

For a commercial finish-out, the alterations checklist asks for 100% construction documents, a completed CO application, three plan sets (four when food service is involved), and a plan review deposit equal to 65% of the building permit fee at submittal. Projects over $50,000 need a TDLR accessibility project number before the city will take the application.

The certificate of occupancy

Grapevine requires a CO before anyone occupies a new nonresidential building or re-occupies a tenant space, before permanent power or gas, and before a building changes use. The fee is $50, waived when the CO rides on an active building permit. Building, electrical, plumbing, mechanical, and fire inspections come first, plus health where food is handled. A business involved in sales must hand over its state sales tax number before the CO issues, every tenant needs its own CO, and the city doesn’t require a separate business license.

Food service goes through Tarrant County

Grapevine is one of the cities where Tarrant County Public Health regulates food establishments. The county’s plan review application wants the menu, a spec sheet for every piece of equipment, a site plan, a scaled floor plan showing equipment, plumbing, electrical, and ventilation, and a finish schedule room by room. Our restaurant construction page covers how we sequence that work.

Dining room at Pizza Twist in Irving with a wood slat ceiling hung with greenery, black pendant lights, a long oak table with red stools, and a glass storefront Nearby work: Pizza Twist in Irving, a 2,000-square-foot restaurant MASACO built out while it stayed open.

Fire review uses outside engineers

Every sprinkler and fire alarm plan in Grapevine goes to a third-party reviewer approved by the fire department, paid by the submitting company, and the permit issues once the department has the reviewer’s stamped PDF. Final or CO inspections come before move-in, and after-hours inspections cost $200 for up to two hours. One rule catches owners off guard: a replacement fire alarm panel must now be an addressable system. Swapping old for old isn’t allowed.

Historic review comes before the building permit

In Grapevine’s historic districts and on landmark properties, exterior work needs a Certificate of Appropriateness. That covers new paint colors, doors and windows, siding, signs, light fixtures, landscaping, demolition, and new construction. Staff can approve many simple requests within a few days. Larger projects go to the Historic Preservation Commission, which meets monthly, and complete applications are due four weeks ahead.

“Submission / Approval of a Certificate of Appropriateness does not constitute approval of a Building Permit.”

From the City of Grapevine’s Certificate of Appropriateness requirements.

Two approvals, two clocks. Inside the Historic Grapevine Township and on every landmark, the city also requires a documented pre-construction meeting before it issues the building permit, with the owner, the contractor, the Historic Preservation Officer, and a building inspector all present. We’d be the contractor in that room.

New houses and additions in the Township now follow The Grapevine Pattern Book, adopted June 17, 2025, which steers designs toward four styles: Folk Victorian, Queen Anne Victorian, Arts and Crafts Bungalow, and Prairie. There’s money on the table, too. The city’s preservation FAQ describes matching grants for exterior work on historic homes in the Township, up to $10,000 at 2 to 1 for owner-occupied houses and up to $5,000 at 1 to 1 for rentals.

Remodeling a Grapevine home, era by era

Cottages and bungalows near downtown

Old houses in the historic districts come with a rulebook, and it’s specific. The porch guideline notes that historic railings in Grapevine were low, under 30 inches, with closely spaced balusters, and asks that replacements match. It wants porch floors of 3/4 to 1 inch tongue-and-groove boards and rules out wrought iron or pipe columns unless the house had them. The window guideline wants original wood windows repaired and kept, and replaced in kind only when they can’t be saved. And the paint guidelines note that most houses in town were painted white, body and trim, with screens or shutters in dark green or black.

A one-story 1910s wood-frame cottage after a porch restoration, with white lap siding, turned porch posts, a low railing, restored double-hung windows, and dark green shutters Illustrative: a 1910s wood-frame cottage after a porch and facade restoration, white with dark green shutters, as Grapevine’s paint guidelines describe.

We plan those exterior details with the preservation staff before pricing, then do the interior work the guidelines don’t touch: wiring, plumbing, insulation, a usable kitchen. A whole-home remodel under one permit usually makes sense on a house this old.

1980s and 1990s subdivisions

In Woods Addition or Shadow Glen, the job is usually the kitchen and the primary bath. Kitchen remodeling in a 1,600-square-foot house from 1987 often comes down to one question: can the wall between kitchen and family room go? Bathroom remodeling in the bigger 1990s houses tends to mean trading an unused tub for a walk-in shower.

Home additions carry the heaviest paperwork. Grapevine’s residential checklist asks for a drainage plot plan, floor and electrical plans, framing plans, elevations, and an engineered foundation plan with the engineer’s letter. A tree inspection comes before any tree is removed or any grading starts. Permit fees for additions and remodels run $1.00 per square foot of new or altered area.

Three Grapevine landmarks

Grapevine Main Station

The station at Main Street and Dallas Road is the only brick-and-mortar building serving the 27-mile TEXRail line and the Grapevine Vintage Railroad. Its 150-foot observation tower looks out over the city and DFW Airport, and the visitors bureau describes a Peace Circle of bronze sculptures on its plaza, depicting the 1843 treaty talks between Sam Houston and ten American Indian leaders.

Grapevine Main Station at dusk, a brick building with arched windows and cream stone trim beside a tall brick clock tower, with tables on the plaza in front Grapevine Main Station at Main Street and Dallas Road, with its 150-foot observation tower.

The Torian Log Cabin

This cabin of hand-hewn logs first stood near the pioneer community of Dove, on a headright settled in 1845 by Francis Throop. John R. Torian bought the property in 1886, and his family lived in the cabin until the 1940s. It was moved about four miles to downtown in 1976, and the Texas Historical Commission records it as a Recorded Texas Historic Landmark at 205 Main Street.

The Torian Log Cabin in Grapevine, a hand-hewn log house with white chinking, a stone chimney, wood shingle roof, and a shed porch decorated with pumpkins The Torian Log Cabin, moved to downtown Grapevine in 1976.

Nash Farm

At 626 Ball Street, Nash Farm keeps 5.2 acres of farmland inside a fully suburban city. Its National Register nomination dates the two-story wood-frame I-house to about 1867 and the barn to about 1905, and records a restoration between 2006 and 2008 by the City of Grapevine and the Grapevine Heritage Foundation. It was listed in 2010.

The two-story Nash farmhouse in Grapevine, a pale green clapboard I-house with dark green trim, a front porch and balcony, and brick chimneys at each end The Nash farmhouse at 626 Ball Street, built about 1867.

How a Grapevine project runs with MASACO

Every job follows the six steps on our process page:

  1. Understand. We walk the suite or the house with you, and on Main Street we check the historic district map first.
  2. Visualize. You see 3D renderings before we price anything, which also helps at a preservation pre-application meeting.
  3. Plan. A fixed-scope proposal organized by trade, with allowances spelled out.
  4. Execute. One project manager and written photo updates every week. We handle the permit, third-party fire review, county health review, and the pre-construction meeting where it applies.
  5. Deliver. A close-out package with as-builts, permits, inspection records, the CO, and warranties.
  6. Support. We stay reachable after handover.

Leasing a suite off SH 114, reworking a brick storefront near the station, or finally fixing a 1990s kitchen in Western Oaks? Book a consultation. We’ll walk it with you and come back with a plan you can hold us to.

Building in Grapevine: what to know.

Grapevine went from roughly 20% developed in the 1970s to well above 90% built out, so most work here reworks what already stands: brick storefronts on Main Street from the late 1800s and early 1900s, wood-frame houses in the Original Town and College Street districts, and 1980s and 1990s subdivisions like Woods Addition and Shadow Glen. Commercial space runs from Historic Main Street out to Grapevine Mills and the SH 114 and SH 121 corridor at DFW Airport's north entrance. The Building Services Department at 200 South Main Street issues permits and certificates of occupancy under the 2021 international codes, in effect since January 1, 2024, and exterior work in the historic districts needs a Certificate of Appropriateness first.

Grapevine neighborhoods and districts.

  • Historic Main Street
  • Grapevine Main
  • Original Town Historic District
  • College Street Historic District
  • West Wall Street Historic District
  • D. E. Box Addition Historic District
  • Woods Addition
  • Shadow Glen
  • Countryside Estates
  • Winding Creek
  • Western Oaks
  • Grapevine Mills area
  • Kubota Way business park
  • SH 114 and SH 121 corridor

Grapevine on the map.

Open Grapevine, TX in Google Maps

Photo credits

  • GrapevineTX MainSt 04Mar2018.jpg by diego_bf109, CC BY-SA 2.0, via Wikimedia Commons.
  • Grapevine Mills Entry 4.jpg by LazyCat256, CC0, via Wikimedia Commons.
  • Original Town Residential Historic District Grapevine Wiki 3 (1 of 1).jpg by Renelibrary, CC BY-SA 4.0, via Wikimedia Commons.
  • Grapevine Main Station.jpg by PCHS-NJROTC, CC BY-SA 4.0, via Wikimedia Commons.
  • Torian Log Cabin in Grapevine, TX, Oct 2012.jpg by Wildstoo, CC BY-SA 3.0, via Wikimedia Commons.
  • Nash Farm House Grapevine Wiki (1 of 1).jpg by Renelibrary, CC BY-SA 4.0, via Wikimedia Commons.

What we build in Grapevine

Every service, one accountable contractor.

All services
Order counter at Pizza Twist in Irving, a franchise restaurant built by MASACO as general contractor 01

General Contracting

One accountable general contractor for Dallas remodels, additions, and build-outs: design, permits, licensed trades, and a single project manager.

Timelines follow scope: single-room projects often run a few weeks on site, while additions and whole-home work typically run several months.

Explore
Open-plan living and dining room after a whole-home remodel of a 1960s Dallas ranch house: removed walls, vaulted ceiling with beams, white 02

Whole-Home Remodeling

Whole-home remodels for Dallas houses built from the 1920s to the 1990s: opened floor plans, structural work, new systems, and one project manager start to finish.

Whole-home remodels commonly run 4 to 9 months on site depending on structural scope; design, engineering, and permitting add time before demolition.

Explore
Finished modern kitchen remodel in a Dallas home: large island with quartz countertop, flat-panel walnut and painted cabinetry, pendant ligh 03

Kitchen Remodeling

Design-build kitchen remodels across Dallas: new layouts, cabinetry, countertops, lighting plans, and relocated plumbing and electrical, permitted and inspected.

Full kitchen remodels typically run 6 to 10 weeks on site once cabinets and countertops are ordered; design and ordering add several weeks up front.

Explore
Finished primary bathroom remodel: large-format porcelain tile, curbless shower with frameless glass, floating walnut double vanity, warm sc 04

Bathroom Remodeling

Primary and hall bathroom remodels across Dallas: tub-to-shower conversions, wet rooms, proper waterproofing, relocated plumbing on slab, permitted and inspected.

Primary bathroom remodels typically run 4 to 8 weeks on site once tile, glass, and fixtures are in hand; hall baths often run shorter.

Explore
Newly built sunlit family room addition on a North Texas home, seen from the original house through a wide cased opening, matching trim, tal 05

Home & Room Additions

Ground-floor and second-story additions for Dallas homes, designed in 3D, engineered for your slab, and built to match the original brick.

Additions commonly run several months from design approval to move-in, depending on size, engineering, and permit review.

Explore
Exterior of a newly built contemporary custom home in a North Texas suburb at golden hour: limestone and dark standing-seam roof, large glaz 06

Custom Home Building

Design-build custom homes and teardown rebuilds on Dallas infill lots, visualized in 3D and priced by phase before you commit.

Custom homes commonly take a year or more from design through move-in, and teardown lots add demolition and utility work up front.

Explore
Client lounge at Calibration Brain & Body in Frisco, a 4,250 SF commercial build-out by MASACO 07

Commercial Construction & Build-Outs

Interior build-outs and light commercial construction for offices, retail, and medical spaces across Dallas, scheduled around your business hours.

Interior build-outs commonly run a few months from permit to certificate of occupancy, and ground-up light commercial takes considerably longer.

Explore
Fade & Style Barber Shop shop floor in Allen, a shell-to-open tenant improvement by MASACO 08

Tenant Improvements & Interiors

Tenant improvement build-outs for restaurants, franchises, salons, and retail across Dallas-Fort Worth, from shell space to certificate of occupancy.

Most single-tenant build-outs run 5 to 8 weeks on site once permits are in hand

Explore

FAQ

Questions from Grapevine owners.